Welded-railway-type crane main beam
A crane and rail-type technology, which is applied in the field of welding the main girder of rail-mounted cranes, can solve the problems of increasing the stress of the crane beam workshop structure, the dead weight of the whole crane, and increasing the investment of the workshop, so as to reduce the maintenance workload and Small self-weight, avoid loose effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.
[0013] see Figure 1 to Figure 3 , The main girder of the welded rail crane includes trolley rail 1, upper flange 2, web 3, lower flange 4, long stiffener 5, short stiffener 6, and longitudinal stiffener 7. It is characterized in that the trolley track 1 and the upper flange 2 are welded together; the lower end of the long stiffener 5 is separated from the lower flange 4 by 20~50mm, one long stiffener 5 and two to three short stiffeners 6 are arranged in sequence, and the distance between the stiffeners 0.5~0.75m, the long stiffener 5 and the short stiffener 6 both play the role of track support points, which are equivalent to the role of railway sleepers. The ribs 7 play a role in limiting the instability of the compression zone of the web 3 .
[0014] Since the trolley rail 1 and the upper flange 2 of the main girder of the welded rail cra...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com