A Rapid Construction Method for Embedded Track System
A technology of embedded track and construction method, which is applied in the direction of tracks, roads, buildings, etc., to achieve the effect of reducing pouring volume, simple operation, and ensuring pouring quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0048] The present invention will be further described below in conjunction with specific examples.
[0049] All features disclosed in this specification, or steps in all disclosed methods or processes, except for mutually exclusive characteristics and / or steps, can be combined in any way, unless otherwise stated, they can be used by other equivalent or similar Instead, each feature is intended to be replaced by alternative features, that is, each feature is only one embodiment of a series of equivalent or similar features unless stated otherwise.
[0050] Such as figure 1 , figure 2 , image 3 As shown, this embodiment is in the subgrade section, and the steel rail used is 59R2 grooved rail; the polymer casting material is a composite material made of polyurethane material and rubber particles; the elastic backing plate is a polyurethane high-elastic backing plate; the height adjustment pad The plate material is the same as the pouring material, and the thickness is 2mm, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com