Rapid ecological restoration method for rock-soil side slopes
An ecological restoration and rapid technology, applied in botany equipment and methods, excavation, gardening, etc., can solve the problems of poor ecological restoration landscape effect, slow vegetation growth, and difficult ecological restoration of rocky slopes, and achieve scientific preparation and preparation Simple and effective landscape configuration
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0053] The construction season is summer, and the site is in Wuhan, Hubei.
[0054] The slope angle is about 45°, the height is 3m, and the width is 20m. First lay a layer of bricks on the slope, and then cement the joints to simulate the rocky slope. Choose Ф14 anchors (length 40cm), the anchor rod needs to leak 10cm, and the distance between anchors is 1m×1m. The anchors at the top of the slope (with a specification of Ф14 and a length of 50cm) are arranged densely and slightly upward (the included angle with the slope is 50°). Then lay galvanized chain link fence from top to bottom (the specification is Ф14, the mesh is 5×5cm), and the meshes and the joints with the anchors are bound firmly with iron wires (the specification is Ф16). The upper mesh is kept 8cm away from the slope, and the lower mesh is close to the slope.
[0055] Mix soil: cement: vegetation concrete additive A-B bacteria: straw: organic fertilizer: slag: water retaining agent according to the weight ra...
Embodiment 2
[0064] The construction season is summer, and the site is in Wuhan, Hubei. The slope angle is about 45°, the height is 3m, and the width is 20m. First lay a layer of bricks on the slope, and then cement the joints to simulate the rocky slope. Choose Ф14 anchors (length 40cm), the anchor rod needs to leak 10cm, and the distance between anchors is 1m×1m. The anchors at the top of the slope (with a specification of Ф14 and a length of 50cm) are arranged densely and slightly upward (the included angle with the slope is 50°). Then lay galvanized chain link fence from top to bottom (the specification is Ф14, the mesh is 5×5cm), and the meshes and the joints with the anchors are bound firmly with iron wires (the specification is Ф16). The upper mesh is kept 8cm away from the slope, and the lower mesh is close to the slope.
[0065] Mix soil: cement: vegetation concrete additive A-B bacteria: straw: organic fertilizer: slag: water retaining agent according to the weight ratio of 10...
Embodiment 3
[0074] The construction season is summer, and the site is in Wuhan, Hubei. The slope angle is about 45°, the height is 3m, and the width is 20m. First lay a layer of bricks on the slope, and then cement the joints to simulate the rocky slope. Choose Ф14 anchors (length 40cm), the anchor rod needs to leak 10cm, and the distance between anchors is 1m×1m. The anchors at the top of the slope (with a specification of Ф14 and a length of 50cm) are arranged densely and slightly upward (the included angle with the slope is 50°). Then lay galvanized chain link fence from top to bottom (the specification is Ф14, the mesh is 5×5cm), and the meshes and the joints with the anchors are bound firmly with iron wires (the specification is Ф16). The upper mesh is kept 8cm away from the slope, and the lower mesh is close to the slope.
[0075] Mix soil: cement: vegetation concrete additive A-B bacteria: straw: organic fertilizer: slag: water retaining agent according to the weight ratio of 10...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com