Medium-term load forecasting system for regional power grid master devices
A technology for load forecasting and regional power grids, applied in forecasting, information technology support systems, instruments, etc., to solve problems such as lack of main equipment load forecasting and no main equipment load forecasting software.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The present invention will be further described below in conjunction with accompanying drawing.
[0040] The main equipment medium-term load forecasting system of the present invention is an application system for decision-making assistance or reference for the electric power department. This system adopts the large-scale relational database management system Microsoft Office Access issued by Microsoft. In order to facilitate user operations and enhance software compatibility, Windows is used as the development and operation platform.
[0041] see figure 1 , the medium-term load forecasting system of the main equipment of the regional power grid of the present invention is externally connected to the power monitoring and data acquisition system, the mid-term load forecasting system of the main equipment of the regional power grid includes a data table maintenance module 1, a trend analysis module 2, a load forecasting module 3, an error analysis module 4 and Air temper...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com