Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Medium-term load forecasting system for regional power grid master devices

A technology for load forecasting and regional power grids, applied in forecasting, information technology support systems, instruments, etc., to solve problems such as lack of main equipment load forecasting and no main equipment load forecasting software.

Active Publication Date: 2013-05-22
SHANGHAI MUNICIPAL ELECTRIC POWER CO +2
View PDF0 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the current power system is basically load forecasting for the total demand of the system or for the region, and lacks load forecasting for the main equipment (the main equipment in the power distribution system includes 220kV main transformer, 110kV main transformer, 35kV main transformer and 10kV feeder), and there is no load forecasting software specifically for the main equipment

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Medium-term load forecasting system for regional power grid master devices
  • Medium-term load forecasting system for regional power grid master devices
  • Medium-term load forecasting system for regional power grid master devices

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] The present invention will be further described below in conjunction with accompanying drawing.

[0040] The main equipment medium-term load forecasting system of the present invention is an application system for decision-making assistance or reference for the electric power department. This system adopts the large-scale relational database management system Microsoft Office Access issued by Microsoft. In order to facilitate user operations and enhance software compatibility, Windows is used as the development and operation platform.

[0041] see figure 1 , the medium-term load forecasting system of the main equipment of the regional power grid of the present invention is externally connected to the power monitoring and data acquisition system, the mid-term load forecasting system of the main equipment of the regional power grid includes a data table maintenance module 1, a trend analysis module 2, a load forecasting module 3, an error analysis module 4 and Air temper...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a medium-term load forecasting system for regional power grid master devices. The medium-term load forecasting system comprises a data sheet maintenance module, a trend analysis module, a load forecasting module, an error analysis module and a temperature influence module. The data sheet maintenance module is used for managing a data sheet and processing data at an earlier stage. A user can visually know load development trends of the master devices by the aid of the trend analysis module. The load forecasting module builds a forecasting model base including five forecasting methods which are a month coefficient method, a trend ratio method, a link relative ratio method, a multiple proportion method and an increase rate method, and the user can voluntarily select the forecasting methods. The error analysis module is used for computing absolute percentage errors of forecasting results of the master devices and analyzing the optimal forecasting method suitable for the master devices according to error results. The temperature influence module is used for adding temperature influence factors based on load forecasting to obtain load forecasting results at different temperatures ranging from 35 DEG C to 40 DEG C in summer.

Description

technical field [0001] The invention relates to a medium-term load forecasting system for main equipment of a regional power grid, which belongs to the field of electric load forecasting. Background technique [0002] Power load forecasting is the basis of the economic operation of the power system and an important part of power system planning. The power system adjusts and manages the load on the basis of load forecasting to ensure the balance of power supply and demand. Therefore, load forecasting has become one of the important tasks of power system dispatching, power consumption management, planning and other departments. [0003] Electric medium-term load forecasting is an important content of load forecasting. In this field, there have been relatively systematic researches at home and abroad, and the researches on various forecasting methods have been relatively mature and in-depth. However, the current power system is basically load forecasting for the total demand o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/04G06Q50/06
CPCY04S10/54Y04S10/50
Inventor 余浩斌连鸿波胡翼赵时桦李春伟沈忠旗辛洁晴高亦凌汤晓伟刘传铨李家睿裘青云吴春琪田茜
Owner SHANGHAI MUNICIPAL ELECTRIC POWER CO
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products