Electric power converter control device and electric power conversion control method
A technology of power converter and control device, which is applied in the direction of AC motor control, output power conversion device, control system, etc. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0075] figure 1 Shows the first embodiment of the present invention. figure 1 It represents a 5-level power conversion device in which N=2, M=2, L=4 and the single-phase power converter is set as a single-phase 3-level power converter ( Figure 11 ), the above carrier C A 、C B diagram of the waveform. For the above carrier C A , at such that the above carrier frequency f c value from f c1 change to f c2 case, the upper side peak from Ca 1 Change to Ca 2 . The lower peak regardless of the carrier frequency f c How to always be sure.
[0076] On the other hand, for the above carrier C B , at such that the above carrier frequency f c value from f c1 change to f c2 In the case of ND , the upper peak C NU .
[0077] C ND =(Ca 1 -Ca 2 ) / twenty two)
[0078] C NU =(Ca 1 +Ca 2 ) / twenty three)
[0079] Regarding the above carrier C A 、C B The change timing of the upper peak value and the lower peak value of the B Change the above-mentioned carrier C befor...
Embodiment 2
[0084] Next, the points different from the first embodiment will be described with respect to the second embodiment of the present invention. In Embodiment 1, regardless of the carrier frequency f c Carrier C A The lower peak value is always set to a certain value, but if Figure 5 As shown, it is also possible to place the carrier C A The upper peak value of is always set constant.
[0085] If as in this embodiment for the above carrier C A And if the upper peak value is set constant, then when the frequency f of the above-mentioned carrier c value from f c1 change to f c2 case, move the lower side peak from -Ca 1 Change to -Ca 2 .
[0086] On the other hand, for the above carrier C B , at such that the above carrier frequency f c value from f c1 change to f c2 In the case of , as shown in the following equations (4) and (5), the upper peak C NU , lower peak C ND .
[0087] C NU =(Ca 2 -Ca 1 ) / twenty four)
[0088] C ND =-(Ca 1 +Ca 2 ) / 2...(5)
[0089]...
Embodiment 3
[0094] Next, a third embodiment of the present invention will be described on points different from the first embodiment. Although in Embodiment 1 regardless of the carrier frequency f c Carrier C A When the lower peak value is always set to a certain time, individually change the above carrier C A The upper peak of the above carrier C B The upper peak, the lower peak, but if Figure 7 As shown, the above carrier C can also be A 、C B The upper peak value and lower peak value are always set constant, and at the frequency f c When there is a change, change the above carrier C A 、C B the inclination.
[0095] About changing the above carrier C A 、C B The timing of the slope, from the above carrier C A The slope is changed to a new slope from the time of the timing 16 when it becomes a trough. Later, at the above carrier frequency f c In the event of a change, repeat the same action.
[0096] Like this, even in the above carrier C A 、C B The upper peak value and th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com