Method and system for optimizing starting sequence of power generators
A start-up sequence and optimization method technology, applied in the electric power field, can solve problems such as failure to find, reduce efficiency of generator start-up sequence, optimal power transmission path is not optimal, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] see figure 1 As shown, it is a schematic flow chart of an embodiment of the method for optimizing the generator starting sequence of the present invention, which includes steps:
[0034] Step S101: Determine the shortest weighted path from the electrified network to each target generator and the parent node information of each node in each of the shortest weighted paths, and determine the weight of each of the shortest weighted paths;
[0035] Step S102: Determine the comprehensive priority index of each of the target generators according to each of the weights and the preset start-up capacity and ramp rate of the corresponding target generator;
[0036] Step S103: taking the target generator with the smallest comprehensive priority index as the starting target;
[0037] Step S104: Determine the shortest weighted path of the starting target according to the parent node information;
[0038] Step S105: Solve the starting target and the system composed of the shortest w...
Embodiment 2
[0063] According to the generator starting sequence optimization method of the present invention, the present invention also provides a generator starting sequence optimization system, which includes: a search module 201, an index determination module 202, a target determination module 203, a path determination module 204, and a solution module 205 , judging module 206, merging module 207, wherein:
[0064] A search module 201, configured to determine the shortest weighted path from the electrified network to each target generator and the parent node information of each node in each of the shortest weighted paths, and determine the weight of each of the shortest weighted paths;
[0065] An index determination module 202, configured to determine the comprehensive priority index of each of the target generators according to each of the weights and the preset start-up capacity and ramp rate of the corresponding target generator;
[0066] The target determination module 203 is con...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com