Scheduling method of subway attendant management system
A management system and crew technology, applied in data processing applications, multi-programming devices, computing, etc., can solve problems such as error-prone, heavy workload, etc., and achieve the effect of less error-prone, easy operation, and safe management.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0055] In order to make the purpose, technical solutions and advantages of the present invention clearer, the various embodiments to be described below will refer to the corresponding drawings, and these drawings constitute a part of the embodiments, which describe various possible implementations of the present invention. kind of embodiment. It is to be understood that other embodiments may be utilized or structural and functional modifications may be made to the embodiments set forth herein without departing from the scope and spirit of the present invention.
[0056] Such asfigure 1 As shown, in the scheduling process of subway crew management, there is a lot of data and the process is complicated. The most important steps after simplification mainly include generating the route table and crew schedule table. Among them, after importing the subway timetable data, crossing road and station data, and setting crossing road parameters, the crossing road table data is generated ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com