System and method for cradle cantilever construction
A hanging and bottom mold technology, used in the erection/assembly of bridges, bridges, buildings, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] In order to adapt to the application of hanging basket hanging construction in the main girder of wider bridge deck, the present invention provides a hanging basket hanging construction system. The invention will be described in detail below with reference to the accompanying drawings.
[0019] Such as figure 1 , figure 2 As shown, the hanging basket suspension construction system provided by the present invention includes a hanging basket device and a running device.
[0020] The hanging basket device includes four groups of main trusses 11, 12, 13, 14 arranged above the concrete main beam 100 and eight groups of bottom mold support devices 10 arranged below the concrete main beam, each group of main trusses 11, 12, 13, 14 Arranged along the direction of the transverse bridge respectively, each set of main trusses corresponds to two sets of bottom mold support devices 10, and the front and middle parts of the bottom mold support devices 10 are respectively provided w...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com