Leakage-proof type temporary blockage additive for low-pressure thin oil well
A temporary plugging agent and oil well technology, applied in the direction of drilling compositions, chemical instruments and methods, etc., can solve the problems of reduced fluid production, well plugging, well solidification, etc., and achieve the effect of low cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0013] This embodiment provides an anti-leakage temporary plugging agent for low-pressure thin oil wells.
[0014] Temporary plugging agent raw material formula:
[0015] 0.04-0.06 tons of hydroxypropyl guar gum, 0.02-0.04 tons of organic titanium, 0.5-1 tons of petroleum resin, 0.03-0.05 tons of dodecyl dimethyl betaine, 0.01 tons of sodium sulfite, and 0.002-0.004 tons of ammonium persulfate And 8.85-9.35 tons of water.
[0016] The functions of the main components in the anti-leakage temporary plugging agent for low-pressure thin oil wells provided in this embodiment are as follows:
[0017] Hydroxypropyl guar gum and organic titanium are cross-linked to form a gel system. The embodiment of the present invention selects hydroxypropyl guar gum because compared with other plant gums, such as squash gum, hydroxypropyl guar gum and organic titanium The cross-linking is more thorough, and the cross-linking reaction can be completed quickly, so the gelation time of the gel syst...
Embodiment 2
[0026] Temporary plugging agent raw material formula:
[0027] 0.2 tons of hydroxypropyl guar gum, 0.1 tons of organic titanium, 2.5 tons of petroleum resin, 0.15 tons of dodecyl dimethyl betaine, 0.05 tons of sodium sulfite, 0.01 tons of ammonium persulfate and 44.25 tons of water.
[0028] Well Hainan 10-4 currently has 6 gas layers in the production zone, all with a permeability of 1000×10 -3 μm 2 Above, the maximum permeability is 3028.1×10 -3 μm 2 In the past, the leakage was very serious during well flushing, and there was basically no liquid return during hot flushing, and the casing pressure was still negative after well flushing; during the operation of well flushing, there was no liquid return after 10 trucks and 150 square meters of well flushing. On June 4, 2009, the temporary plugging agent was used for temporary plugging, 45 cubic meters of temporary plugging agent was squeezed in, and then replaced with clean water, the pressure reached 2.0MPa, and normal wel...
Embodiment 3
[0030] Temporary plugging agent raw material formula:
[0031] 0.24 tons of hydroxypropyl guar gum, 0.12 tons of organic titanium, 3 tons of petroleum resin, 0.18 tons of lauryl dimethyl betaine, 0.048 tons of sodium sulfite, 0.012 tons of ammonium persulfate and 45 tons of water.
[0032] Well Hainan 19-9 was washed with 30 trucks during the overhaul at the end of 2008, and a total of 450 cubic meters of liquid did not return. Before the sand washing operation on October 12, 2009, the temporary plugging agent was used for temporary plugging, and the temporary plugging agent was squeezed in for 50 The pressure reaches 6.0MPa, which meets the sand washing pressure requirement. After the operation is completed, the well sees oil after 3 days of drainage, and reaches the production level before the operation 2 days after the completion of the drainage. Currently, the well is in good production condition. After the operation, there was no accident of rubber-breaking fragments stuc...
PUM
Property | Measurement | Unit |
---|---|---|
softening point | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com