An ecological net applied to melon and fruit crops
An ecological net, melon and fruit technology, applied in the field of the ecological net of melon and fruit crops, can solve the problems affecting the appearance and quality of the melon and fruit crops, insufficient light, easy to grow white flesh, etc., to reduce or avoid the use of pesticides, Speed up the development process and reduce the effects of spraying
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] ① On-site drawing by technicians: accurate mapping and recording of the area, shape, topography, soil quality, and geographical location of the planting area.
[0021] ② Formulate construction plans and material procurement plans: formulate corresponding construction plans based on surveying and mapping data and site conditions, and calculate the amount of materials used for procurement.
[0022] ③ Arrange detailed construction plans: assign tasks to professional construction personnel and formulate detailed construction plans.
[0023] ④ Prepare construction materials and tools: Ensure that the procurement plan is completed before construction, and prepare various construction equipment and tools.
[0024] ⑤ Support frame installation and fixing: Insert the arch support frame into the ground 0.3m, the height above the ground is 0.5-1m, the span of the arch frame is 1.5-2m, and the distance between the frames is 1m.
[0025] ⑥ Ecological net laying and fixing: Bind the...
Embodiment 2
[0028] ① On-site drawing by technicians: accurate mapping and recording of the area, shape, topography, soil quality, and geographical location of the planting area.
[0029] ② Formulate construction plan and material procurement plan: formulate corresponding construction plan according to surveying and mapping data and site conditions, and calculate the amount of materials used for procurement.
[0030] ③ Arrange detailed construction plans: assign tasks to professional construction personnel and formulate detailed construction plans.
[0031] ④ Prepare construction materials and tools: Ensure that the procurement plan is completed before construction, and prepare various construction equipment and tools.
[0032] ⑤ Support frame installation and fixation: Weld two semicircular arched tubes on a connecting rod to form an arched support frame. The height of the support frame is 0.5-1m, the span is 1.5-2m, the length of the connecting rod is 1m, and the distance between the su...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com