Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

In-dock super-large ship floating secondary positioning process

A secondary positioning and super-large technology, applied in ship components, ship construction, ships, etc., can solve problems such as high cost, affecting the normal operation of enterprises, and backlog of funds

Inactive Publication Date: 2011-06-15
江苏新世纪造船有限公司
View PDF4 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the rapid development of my country's shipbuilding industry, the ships built by the one-way construction method in the dock can no longer meet the requirements of the situation. On the one hand, this shipbuilding method is costly and the shipbuilding cycle is longer; The backlog of funds affects the normal operation of the enterprise

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0004] The present invention is a floating secondary positioning process for ultra-large ships in dock. Before water enters the dock, the integrity of the ship is required; the ship is launched first, that is, the first two complete ships in the dock: according to the construction integrity standard, all the work on the hull is completed, and the upper layer The construction pyrotechnic correction is completed, the underwater engineering installation is completed, the hull shell paint is completely completed, the entire ship’s airtightness is completely completed, all uninstalled outfitting parts on the upper deck are hoisted in relative positions on the deck, and the pre-outfitting rate in the entire dock reaches policy requirements. Then float and position the sinking ship, that is, the two and a half ships in the dock need to be closed to the designated section, and the other sections are closed after floating. During specific implementation, in order to ensure that the who...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an in-dock super-large ship floating secondary positioning process, which comprises the following steps of: ensuring that a ship meets an requirement on integrity before water enters a dock; making a ballasting and pier adding scheme and a dock pier fixing scheme before water enters the dry dock; arranging folding piers at right positions at the bottoms of ballast tanks of the whole ship and a half ship according to a requirement of a folding pier arrangement diagram; before water in the dock is drained, making preparation; marking water gauges on the front, tail, and left and right gunwales of the half ship respectively by using a paint, and using the water gauges as basis for observing longitudinal and transverse inclination of a ship body; observing and measuring in the process of introducing water into the dock; when the water begins entering the dock, gradually loosening a cable manually, and measuring and secondarily positioning the half ship; checking and arranging the dock piers; and washing the bottom of the dock and cleaning a cargo room. In the process, when the whole ship is launched, the half ship immediately moves to the position of the whole ship to be continuously hoisted and folded, the folding period of a ship under construction in the dock is shortened, and precious resources of gantry cranes are utilized to the greatest extent.

Description

Technical field: [0001] The invention relates to a ship manufacturing process, in particular to a floating secondary positioning process in a super-large ship dock. Background technique: [0002] With the rapid development of my country's shipbuilding industry, the ships built by the one-way construction method in the dock can no longer meet the requirements of the situation. On the one hand, this shipbuilding method is costly and the shipbuilding cycle is longer; The backlog of funds affects the normal operation of the enterprise. The ships built by the enterprises are all built by the one-and-a-half construction method in the dock, that is, the new construction technology of the whole ship and the half ship in the dock. That is to say, when the whole ship is launched, the half ship will be moved to the position of the whole ship for continuous hoisting and closing, shortening the closing cycle of the ship under construction in the dock, and maximizing the use of the precio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B63B9/00
Inventor 郑晨阳刘涛孙良郑军
Owner 江苏新世纪造船有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products