Temporary plugging agent for acidization of water injection well of low permeability reservoir

A technology of oilfield water injection and temporary plugging agent, which is applied in the field of temporary plugging agent, and can solve the problems of small distance between water injection layers, small distance between perforation sections, inability to use packer acidification profile control, etc.

Active Publication Date: 2011-03-30
PETROCHINA CO LTD
View PDF1 Cites 22 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is aimed at low-permeability oilfield water injection wells with unbalanced water injection and prominent contradictions. For the same layer, there are more than two perforation sections, and the distance between the perforation sections is small, or the distance between the water injection layers is small, and it is impossible to In the case of using packer acidizing profile control, a temporary plugging agent for water injection well acidizing profile control is provided to realize balanced water injection in the profile of the water injection well

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0013] The acidizing temporary plugging agent for water injection wells in low-permeability oil fields is composed of sodium stearate: sodium tetraborate: acrylic resin No. I = 3: 1: 6 ratio by weight; the polyacrylamide aqueous solution with a mass concentration of 0.2% is used as the temporary plugging agent The mass concentration of the carrier fluid and temporary plugging agent is 10%, and the construction pressure is 1MPa higher than the water injection pressure. For the wells with general profile control and water plugging within or between layers, the low-pressure and slow-velocity method is used to inject; the injection rate is kept at 10m 3 / h. A filter cake with low permeability is formed near the borehole wall, which can effectively prevent temporary plugging agent particles from invading deep into the oil and gas reservoir. At the same time, the temporary plugging agent has good compatibility with water, acid liquid and its additives under the formation conditions....

Embodiment 2

[0015] The acidizing temporary plugging agent for water injection wells in low-permeability oilfields is composed of calcium stearate: zinc borate: acrylic resin No. II = 3:1:6 ratio by weight; polyacrylamide aqueous solution with a mass concentration of 0.2% is used as the temporary plugging agent The mass concentration of temporary plugging agent is 10%, and the construction pressure is 2 MPa higher than the water injection pressure. For the wells with general profile control and water plugging in layers or between layers, low-pressure and slow-velocity injection is adopted; the injection rate is kept at 12m 3 / h. A filter cake with low permeability is formed near the borehole wall, which can effectively prevent temporary plugging agent particles from invading deep into the oil and gas reservoir. At the same time, the temporary plugging agent has good compatibility with water, acid liquid and its additives under the formation conditions. When the acidification plays the role...

Embodiment 3

[0017] The acidizing temporary plugging agent for water injection wells in low-permeability oil fields is composed of magnesium stearate: boric acid: acrylic resin No. III = 3: 1: 6 ratio by weight; the polyacrylamide aqueous solution with a mass concentration of 0.2% is used as the temporary plugging agent carrier fluid , the mass concentration of temporary plugging agent is 10%, and the construction pressure is 1.5 MPa higher than the water injection pressure. For the wells with general profile control and water plugging in layers or between layers, low-pressure and slow-velocity injection is adopted; the injection rate is kept at 15m 3 / h. A filter cake with low permeability is formed near the borehole wall, which can effectively prevent temporary plugging agent particles from invading deep into the oil and gas reservoir. The temporary plugging agent has good compatibility with water, acid liquid and its additives under the formation conditions. Blocking situation.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a temporary plugging agent for the acidization of the water injection well of a low permeability reservoir. The temporary plugging agent is prepared from stearate, borate and acrylate in a weight ratio of 3:1:6; 0.2wt% of polyacrylamide aqueous solution is used as the carrying fluid of the temporary plugging agent, the mass concentration of the temporary plugging agent is10%; the construction pressure is 1-2MPa higher than the water injection pressure, the low-pressure low speed injection is adopted; the injection speed is kept to 10-15m<3> / h; the temporary plugging agent can generate a filter cake with lower permeability near the wall of the well, thus effectively preventing the particles of the temporary plugging agent from intruding the deep part of the oil-gas reservoir; the temporary plugging agent has better compatibility with water, acidizing fluid, additive and the like under the formation condition; and when the shunting and turning functions of acidization are realized, the temporary plugging agent can be washed away fast and completely and the well which is not plugged temporarily can be recovered.

Description

Technical field: [0001] The invention relates to a temporary plugging agent applied to the acidification of water injection wells in low-permeability oil fields. Background technique: [0002] The existing conventional acidizing profile control technology uses packer tools to perform selective acidizing profile control on water injection wells with large intervals between layers or perforation intervals, so that most of the water injection wells with profile unbalanced water injection can be effectively improved. However, there are two limitations at the same time. On the one hand, due to the strong formation heterogeneity in the conventional acidizing process, the acid liquid is likely to "finger" in the large pores and fractures of the high-permeability layer, and it is impossible to make the low-permeability layer and small pores On the other hand, for wells with small distances between layers or perforation intervals, it is impossible to use tools for isolation and acidi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): C09K8/42E21B33/13
Inventor 李长忠张煜纪凤勇杜向前吴涛徐创朝路勇
Owner PETROCHINA CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products