Construction method of foundation pit confined water inrushing emergency water-lowering well
A construction method and technology for confined water, applied in infrastructure engineering, construction, etc., can solve the problems of complex well closing procedures and high construction difficulty
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The features of the present invention and other related features will be further described in detail below in conjunction with the accompanying drawings through embodiments, so as to facilitate the understanding of those skilled in the art:
[0027] attached Figure 1-7 The marks 1-11 represent: construction surface 1, dewatering well 2, steel casing 3, foundation pit bottom plate 4, bottom concrete top surface 5, steel casing outer ring water-stop steel plate 6, water-stop steel plate outer ring of dewatering well 6', steel casing cutting position 7, grouting pipe 8, well pipe cutting position 9, grouting top surface 10, welded iron plate 11.
[0028] attached figure 1 It is a structural schematic diagram of the emergency dewatering well set up after the pressurized water surge of the present invention, figure 2 It is a schematic diagram of the corresponding foundation pit construction soil layer structure. This embodiment is an emergency well construction process ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com