Method for monitoring the settlement by using inclinometer tube
A technology of inclinometer tubes and monitoring points, which is applied in the directions of measuring devices, surveying and navigation, and infrastructure tests, etc., and can solve problems such as large errors
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] Embodiment 1: In this embodiment, the inclinometer tube is used to monitor the settlement of the ground surface under the existing buildings (structures) during tunnel shielding. Taking the West Xianxia Road Tunnel Project of Shanghai Hongqiao Comprehensive Transportation Hub as an example, the area under section 1 of the taxiway is planned to be selected as the micro-disturbance test area for non-excavation technology buried measuring points.
[0026] According to the existing research results, the fourth layer of soft soil in Shanghai area has certain differences in different regions, including water content, void ratio, strength, compressive modulus, sensitivity, etc. Therefore, even if the shield passes through the silty clay in the fourth layer, the degree of disturbance to the soft soil is different in different regions, and the amount of foundation deformation caused is also different. In order to make the construction parameters and grouting parameters of shield...
Embodiment 2
[0065] Embodiment 2: In this embodiment, the inclinometer tube is used to monitor the settlement of the ground surface under the road when the road is loaded. In order to make the expressway road smooth and run smoothly, it is necessary to carry out settlement monitoring of road load. In the design stage of the expressway, it is generally planned to embed the inclinometer tube in a certain section of the road, that is, to bury the inclinometer tube first, and then lay the road foundation above the inclinometer tube and repair the road. However, in the high-speed running process, sometimes it is necessary to monitor the settlement of the road load on the road section that has been built. At this time, the method of the present invention can be used to design an inclinometer pipe buried at the bottom of the road foundation without damaging the road. The setting track, usually a straight line of pilot holes crossing the foundation laterally. The drilling and reaming of the pilot...
PUM
Property | Measurement | Unit |
---|---|---|
Length | aaaaa | aaaaa |
Length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com