Horizontal drainage and quick consolidation method for reinforcing new hydraulically filled sludge and pipe-laying equipment thereof
A technology of silt filling and horizontal drainage, applied in soil protection, infrastructure engineering, construction, etc., can solve problems such as delay time, construction period, inability to guarantee drainage consolidation, and small drainage consolidation range, and achieve low cost. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] 1. Move the mobile device 1 equipped with buoy-type crawlers that can walk in the mud to the construction site, install the drainage filter pipe on the support 5 and introduce the drainage filter pipe from the support to the entrance of the pile pipe 7, and remove them one by one. The inlet leads into the horizontal outlet port 8 . In this example, 3 upper and lower layers are laid, 4 horizontal rows, and 12 pieces are laid by a single machine. The 1.5~2.5m of the top end of the drainage filter pipe keeps the side wall sealed, that is, there is no permeable hole. The terminal is led out from the horizontal outlet port 8, and then the length of the outlet is maintained according to different layer depths, so that the length is enough to expose the mud for 30~60cm after the pipelayer sinks into the designed depth of the mud.
[0043] 2. The landing gear 3 falls, and the pipelayer platform 12 is leveled downward from the vertical direction and close to the mud surface, and...
Embodiment 2
[0053] 1. The equipment and method used are the same as in Example 1.
[0054] 2. Only the drainage channel under the silt used in this example is a drainage board, and the exit of the pile pipe of the pipelayer is as follows Figure 4 The structure, that is, adopts the flat mouth form, and there are bayonets on the horizontal sides of the outlet, that is to say, the starting end of the drainage board is left in the mud (if the starting end of the drainage board is exposed, there is no need for concave Groove and check pin, method is with embodiment 1).
[0055] 3. Both the starting end and the terminal end of the drainage board must be rolled up 30~60cm along the drainage direction of the board groove and inserted into the vertical drainage pipe sealed on the side wall, and the vertical drainage pipe should be exposed to the ground for 30~60cm, so as to be consistent with the horizontal drainage pipe on the ground. connected.
[0056] The moving device of the plow-type hori...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com