Tunnel ventilation communication system and its wind power distribution and regulating method
A tunnel ventilation and intercommunication system technology, applied in mine/tunnel ventilation, earthwork drilling, mining equipment, etc., can solve problems such as idle equipment, inability to interoperate and deploy ventilation devices, and insufficient wind power of fans, etc., to achieve scheduling and Allocate and improve the effect of equipment utilization
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0015] Depend on figure 1 It can be seen that the ventilation intercommunication system of the double air duct tunnel is composed of two ventilation devices, two mutual ventilation ducts and five valves; wherein the first ventilation device is composed of the first air duct 11 and the first fan 12, and the first air duct 11 is A pipe with openings at both ends, one end is the first air inlet, the other end is the first air outlet, the first air inlet is connected to the first fan 12, and the first air outlet is arranged on the first face 13 to be ventilated; the second Ventilation device is made up of the second wind cylinder 21 and the second blower fan 22, and the second wind cylinder 21 is the pipeline of opening at two ends, and one end is the second air inlet, and the other end is the second air outlet, and the second air inlet is connected to the second air inlet. Fan 22, the second air outlet is arranged on the second palm surface 23 to be ventilated; the first mutual v...
Embodiment 2
[0023] Depend on figure 2 It can be seen that the ventilation intercommunication system of the three-air duct tunnel is composed of three ventilation devices, four inter-ventilation ducts and eight valves; wherein the first ventilation device is composed of the first air duct 101 and the first fan 102, and the first air duct 101 is A pipe with openings at both ends, one end is the first air inlet, the other end is the first air outlet, the first air inlet is connected to the first fan 102, and the first air outlet is arranged on the first face 103 to be ventilated; the second Ventilation device is made up of second air cylinder 201 and second blower fan 202, and second air cylinder 201 is the pipeline of two ends opening, and one end is the second air inlet, and the other end is the second air outlet, and the second air inlet is connected to the second air inlet. Fan 202, the second air outlet is placed on the second palm surface 203 to be ventilated; the third ventilation de...
Embodiment 3
[0035] The Maluqing Tunnel on the Yiwan Railway is a double-track railway tunnel with horizontal guides. The total length of the tunnel is 7,879 meters, and the entrance section and horizontal guides have been excavated nearly 4,000 meters. How to improve the ventilation of the tunnel is a big problem. The traditional method is to move and increase ventilation mechanical equipment in the tunnel, which not only increases the input cost but also has troubles of frequent moving equipment. After using the three air cylinder tunnel ventilation intercommunication system of the present invention, the original independent air cylinder ventilation devices are connected to each other, and the ventilation condition of the tunnel has been greatly improved, which not only meets the tunnel ventilation requirements, but also does not require more investment The mechanical equipment works well.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com