Emergency method for controlling bridge crane failure
An overhead crane and crane technology, applied in the directions of walking overhead cranes, cranes, transportation and packaging, can solve problems such as safety hazards for enterprises and employees, inability to control overhead cranes, accidents, etc., and achieve strong practicability, The effect of curbing the occurrence of major accidents
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] Case analysis of main hook brake failure of 150t bridge crane:
[0026] The driver starts the 150t bridge crane, puts the test station over the flat car, lifts the rotor of the 30SH086 turbo generator that has completed the coil embedding, and prepares to put it into the rotor vacuum drying room for baking. , the 150t hook suddenly had a brake failure phenomenon, and the 300,000-kilowatt rotor dropped out of control. If measures are not taken in time, it will pose a great danger to the product and personal safety. The driver first performs several consecutive jog reverse operations , at this time, the jog reverse operation, the lifting mechanism mainly focuses on rising, supplemented by down jogging operation; the running mechanism mainly focuses on jogging operation in the opposite direction, supplemented by jogging operation in the same direction When the operating handle is closed, the failure still exists, indicating that the bridge crane has a mechanical failure. T...
Embodiment 2
[0029] Use the "Case Case of Hook Sliding Accident When a 300t / 80t Bridge Crane Lifts a 125,000-kilowatt Motor" to illustrate: Observe the state of no acceleration when the object falls, and the emergency method of cutting off the power supply can be used to control the "failure" of the bridge crane Accident and control of overhead crane "failure" caused by confirmed "electrical failure".
[0030] The driver of the bridge crane drives the 300t / 80t bridge crane, lifts the stator frame of the steam turbine generator with a capacity of 125,000 kilowatts with a main hook with a rated lifting capacity of 300t, and prepares to pack the finished stator frame .
[0031] The weight of the finished stator frame of a 125,000-kilowatt turbo-generator is 102t. Using a main hook with a rated lifting capacity of 300t to lift the stator frame of a 125,000-kilowatt turbo-generator should be capable of lifting At work, when the bridge crane raised the stator base from its original position to ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com