Method and installation for destroying waste detonator
A technology of destruction device and detonator, which is applied in the combustion method, combustion type, incinerator, etc., can solve the problems of high sensitivity, high requirements for destruction site, and large security warning range, so as to improve economic benefits, occupy less land, and reduce volume small effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0016] Example 1 The waste detonator destruction device of the present invention can be designed as:
[0017] It is a facility with barbed wire 1 on the top, brick walls on the four walls, and an iron gate 5 on the front wall. On the ground inside the facility, there is a destruction tank 3 meters long, 0.5 meters wide, and 5 centimeters deep from front to back. 4. On both sides of the groove, build a slope 3 combined with the left and right walls 2. In the facility, behind the iron gate 5 on the front wall, build a vertical partition wall 6 connected to the side wall 2. Prevent burning debris from flying onto the door.
[0018] The destruction process of spent detonators is as follows:
[0019] Pack the paper shell industrial fire mine waste in a box without a lid, put it in a special basket, put it into a passivation pool filled with diesel oil and soak it for 72 hours, and then use a special transport tool to passivate the waste fire detonator up to the standard sent to t...
example 2
[0020] Example 2 The waste detonator destruction device of the present invention can be designed as:
[0021] The top is barbed wire 1, the four walls are iron plates, and the front wall has an iron door 5. On the bottom surface of the box, a destruction tank 4 with a length of 3 meters, a width of 0.5 meters, and a depth of 5 cm is installed from front to back. , there is a steel slope 3 combined with the left and right walls 2 on both sides of the groove, and a vertical steel partition 6 connected with the side wall 2 is installed behind the iron door 5 of the front wall in the box. Prevent burning debris from flying onto the door.
[0022] The destruction process of spent detonators is as follows:
[0023] Pack the paper shell industrial fire mine waste in a box without a lid, put it in a special basket, put it into a passivation pool filled with oil and soak it for 96 hours, and then use a special transport tool for the waste fire detonator that has passed the passivation...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com