Mining method for replacement of banded coal under building by waste rock
A technology of strip coal pillars and mining methods, applied in underground mining, fillings, safety devices, etc., can solve the problems of waste of resources, low recovery rate, etc., and achieve the effects of avoiding pollution, eliminating ground gangue hills, and low processing costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] An embodiment of the present invention will be further described below in conjunction with accompanying drawing:
[0017] In the mining method for replacing striped coal pillars with gangue under buildings in the present invention, the gangue filling roadway b is firstly excavated, and after the excavation is completed and the equipment used during the excavation is removed, the gangue filling equipment is arranged gradually from the inside to the outside. Gangue filling treatment. After filling the gangue to fill the main lane, build a wall with cement to seal it. Such as figure 1 As shown, the buried depth of strip coal pillars 1, 2, and 3 is 290m, and the width is 50m. The protection level required for the overlying rock structure and surface buildings is level I, and three gangues are arranged in the center of each strip coal pillar. Filling roadway d (if the cross-section of the filling roadway is designed as a rectangle, the roadway width is generally 3.5-5.0m (...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com