Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Pre-burying construction method for raft foundation anchor bolts of high-rise steel structure deep foundation pit

A technology of raft foundation and anchor bolts, which is applied in the direction of basic structure engineering, construction, etc., can solve the problem that it is difficult to ensure that the embedded bolts will not shift, and achieve convenient operation, improved positioning accuracy, and convenient and fast positioning Effect

Active Publication Date: 2022-06-03
HENAN TIANFON STEEL STRUCTURE CONSTR
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the raft foundation construction of high-rise steel structure buildings, the pre-embedding of anchor bolts is the key process of raft foundation construction, and the pre-embedding accuracy directly affects the installation deviation of the first steel column; the traditional method uses positioning templates or steel-wood hybrid fixing frames. The pre-embedded bolts are fixed. Since the height of the raft foundation is generally above 1.2m, the lower ends of the pre-embedded bolts are suspended in the air. It is difficult to ensure that the pre-embedded bolts will not be displaced during construction processes such as binding steel bars, welding, setting up formwork, and pouring concrete.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pre-burying construction method for raft foundation anchor bolts of high-rise steel structure deep foundation pit
  • Pre-burying construction method for raft foundation anchor bolts of high-rise steel structure deep foundation pit
  • Pre-burying construction method for raft foundation anchor bolts of high-rise steel structure deep foundation pit

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] The present invention will be described in detail below with reference to the accompanying drawings. The following describes in detail the embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein the same or similar reference numerals refer to the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, but not to be construed as a limitation of the present invention. Orientation terms such as left, middle, right, upper and lower in the examples of the present invention are only relative concepts to each other or refer to the normal use state of the product, and should not be regarded as limiting.

[0022] A construction method for pre-embedding anchor bolts of a deep foundation pit raft foundation of a high-rise steel structure, comprising the follo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a high-rise steel structure deep foundation pit raft foundation anchor bolt pre-burying construction method which comprises the following steps that vertically-arranged pre-burying bolts are detachably and fixedly connected to a first supporting frame, and the first supporting frame is connected to a reinforcing mesh of a raft foundation in a clamped mode; a second support frame is detachably and fixedly connected between the middle parts of the embedded bolts; a third support frame is supported between the bottom surface of the foundation pit and the embedded bolts; by adjusting the first supporting frame, the second supporting frame and the third supporting frame, the identification points on the embedded bolts are moved to the set positions, and the third supporting frame is fixedly connected to a waterproof protection layer on the bottom face of the foundation pit; the embedded bolts and the reinforcing mesh are fixedly connected through connecting pieces, and the embedded bolts are fixedly connected to the third supporting frame; the first supporting frame and the second supporting frame are detached from the embedded bolts, and a raft foundation is poured in the foundation pit; therefore, it is guaranteed that the embedded bolt does not deform, shift and sink under the load effect in the whole construction process.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a construction method for pre-embedding anchor bolts of a high-rise steel structure deep foundation pit raft foundation. Background technique [0002] In the raft foundation construction of high-rise steel structure buildings, the pre-embedding of anchor bolts is a key process in the construction of raft foundations, and the pre-embedding accuracy directly affects the installation deviation of the first steel column. Pre-embedded bolts are fixed. Since the height of the raft foundation is generally above 1.2m, and the lower ends of the pre-embedded bolts are suspended in the air, it is difficult to ensure that the pre-embedded bolts will not shift during construction processes such as binding steel bars, welding, formwork and pouring concrete. SUMMARY OF THE INVENTION [0003] In view of the problems in the prior art, the present invention provides a construction ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D27/42
CPCE02D27/42
Inventor 陈孟鑫李旭禄田磊许志民杨天雷宋新利万江龙李昊秦素芳
Owner HENAN TIANFON STEEL STRUCTURE CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products