Automatic construction method of power grid fault traveling wave fault location equation
A technology of traveling wave distance measurement and power grid fault, applied in the direction of fault location, etc., can solve the problems of poor reproducibility, low efficiency, lack of general machine analysis and construction methods, etc., and achieve the effect of enhancing interpretability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Embodiment 1: a method for automatically constructing a power grid fault traveling wave ranging equation, the specific steps are:
[0034] Step1: Carry out engineering processing on the grid method of grid line fault wave process analysis.
[0035] Step2: Generate the total extended branch time record table and the extended branch record table based on the measuring points from the recursive data of the wave process grid method, and write the traveling wave propagation path equation in parallel.
[0036] Step3: On the basis of obtaining the expression of the traveling wave path equation, take the fault distance and fault time as unknown parallel equations, and judge the linear equations according to the relationship between the rank of the coefficient matrix, the number of equations and the number of unknowns Whether it can be solved, if yes, the corresponding ranging formula can be obtained through symbolic operation, if not, the ranging formula cannot be formed.
[0...
Embodiment 2
[0058] Embodiment 2: with figure 1 The 220kV transmission network shown is taken as an example, and the realization process of the proposed scheme is given. Line, zero-mode wave impedance Z c1 =243Ω, Z c0 =598Ω, line zero-mode wave velocity v 1 =2.92×10 5 km / s, v 0 =1.93×10 5 km / s, current traveling wave measuring points are measured in O 1 , O 2 , O 3 , O 4 Marked in the figure, the line lengths are FC=80km, AF=30km, FH=20km, HD=90km, DG=40km, GB=25km, GC=50km.
[0059] Such as Figure 5 As shown, an automatic construction method of grid fault traveling wave ranging equation, the specific implementation steps are:
[0060] Step1: Carry out engineering processing on the grid method of grid line fault wave process analysis, the specific steps are as follows figure 2 shown.
[0061] Step1.1: Use vertices and edges to abstract transmission lines, number the lines, specify fault lines, and generate line-length adjacency matrix. Let line 1 be the fault line, and the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com