Robust optimization scheduling method for regional integrated energy system
An integrated energy system and optimal scheduling technology, applied in the field of robust optimal scheduling of regional integrated energy systems, can solve problems such as load loss and fitting errors, reduce risks, improve heating reliability, and improve system operation robustness Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] 1. Establishment of part load performance function of each energy conversion equipment efficiency
[0055] 1.1 Regional integrated energy system (regional integrated energy system, RIES) framework diagram:
[0056] Coupling regional power grids and heating networks together to achieve multi-energy complementarity and improve energy utilization. The RIES in this embodiment mainly includes energy conversion equipment such as CHP and GB, and energy storage equipment such as batteries and hot water storage tanks. The specific framework is as follows figure 1 shown.
[0057]1.2 PLP function of energy conversion equipment efficiency
[0058] Considering that in actual operation, each energy conversion equipment usually operates under partial load conditions, so the PLP of each energy conversion equipment is calculated, and the calculation formula is:
[0059]
[0060] In the formula: is the equipment efficiency; N is the equipment load rate, that is, the ratio of the ...
Embodiment 2
[0138] Taking a typical RIES as an example, this region uses electricity and natural gas as energy input, and simultaneously supplies electricity and heat loads through energy conversion equipment and transmission networks. The predicted electricity load, heat load and time-of-use electricity price in a certain day in the region are shown in image 3 and Figure 4 . Natural gas price 2 yuan / m 3 , P ELE,max Taking 1MW, the detailed parameters of each equipment in RIES and the fitting parameters of equipment efficiency PLP function are shown in Table 1 and Table 2 respectively. For the piecewise linear representation of the fitting function, considering the balance between linear approximation accuracy and computational efficiency, the number of sections d is generally between 30 and 70, so d=50 is taken.
[0139] Set uncertain parameters When r=0, the RIES scheduling problem is a deterministic optimization problem, that is, the fitting error of the equipment PLP function ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com