Construction method for underneath passing of three-hole highway tunnel through existing railway
A technology for road tunnels and existing railways, applied in office automation, image data processing, instruments, etc., can solve problems such as the inability to adjust the construction progress of tunnels under construction in real time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] The technical solutions in the present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0041] like Figure 1-4 As shown, a construction method for a three-hole road tunnel passing through an existing railway, comprising the following steps:
[0042] S1. Collect the geological data of the three-hole highway tunnel to be crossed by the existing railway area and the geographical coordinate information of the existing railway, and install a number of settlement monitoring sensors and displacement monitoring sensors on the existing railway;
[0043] S2. Utilize modeling software to establish a geological model according to the geological data collected in step S1, and import the geographical coordinate information, the line information and monitoring information of the three-hole highway tunnel into the geological model;
[0044] S3. Determine the geological type and carry out the construction of the main structure ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com