Method and structure for controlling water pressure of bottom plate in deep foundation pit bottom plate construction

A technology for controlling the floor and water pressure, which is applied in infrastructure engineering, construction, etc., to ensure safety and stability, simple construction process, and simple structure.

Active Publication Date: 2021-09-28
中铁十八局集团第五工程有限公司 +1
View PDF6 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] Regarding the above-mentioned prior art, the present invention provides a pumping structure to control the water pressure of the deep foundation pit bottom plate in the strongly weathered aquitard, so as to solve the problem of groundwater permeation that is prone to occur during the construction of the bottom plate of the deep foundation pit (deep working well) in the strongly weathered aquifer Reduce the problem of soil settlement caused by excessive groundwater pumping in surrounding strata

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and structure for controlling water pressure of bottom plate in deep foundation pit bottom plate construction
  • Method and structure for controlling water pressure of bottom plate in deep foundation pit bottom plate construction
  • Method and structure for controlling water pressure of bottom plate in deep foundation pit bottom plate construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] The present invention is used to control the water pressure in the foundation pit floor construction process of the deep foundation pit (deep working well) in the strongly weathered water-permeable fault zone. A trapezoidal trench is used in the center, and a concrete cushion is laid after backfilling with sand and gravel filler, and a stainless steel drainage pipe is implanted, and a hydraulic valve is set on the stainless steel drainage pipe. The blind ditch is composed of circularly arranged and radially arranged trapezoidal cross-section grooves connected to each other, thus forming a continuous drainage and drainage channel. During the construction of the foundation pit floor, the water flow is controlled and discharged through stainless steel drainage pipes; the blind ditch is filled with sand Stone filler to support the shape of the blind ditch and prolong the service life of the blind ditch; after the top of the blind ditch is covered with a layer of concrete cus...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a structure for controlling water pressure of a bottom plate in deep foundation pit bottom plate construction. The structure comprises a blind ditch arranged at the bottom of a concrete cushion layer below a foundation pit bottom plate and a plurality of stainless steel drainage pipes vertically implanted into the blind ditch, wherein the blind ditch comprises a plurality of annular grooves which are concentrically arranged and a plurality of radial grooves which are radially distributed according to the center and penetrate through the plurality of annular grooves; the annular grooves and the radial grooves are backfilled with gravel mixtures; the lower ends of the stainless steel drainage pipes are inserted into the gravel mixtures; the upper ends of the stainless steel drainage pipes penetrate through the concrete cushion layer and the foundation pit bottom plate, and are exposed out of the upper surface of the foundation pit bottom plate; each stainless steel drainage pipe is provided with a water pressure valve; and the upper ends of all the stainless steel drainage pipes are gathered and then connected to a water pipe. The structure is beneficial to pouring of the deep foundation pit (deep working well) bottom plate during construction and control of water pressure of the bottom plate during working and service, sedimentation of surrounding soil layers caused by excessive pumping of underground water is avoided, and safety of surrounding buildings is guaranteed.

Description

technical field [0001] The invention relates to a blind ditch structure of a deep foundation pit (deep working well) in an aquitard, in particular to a pumping structure for controlling the floor water pressure of a deep foundation pit (deep working well) in a strongly weathered permeable layer. Background technique [0002] With the rapid development of my country's economy and the rapid growth of city size and population, the above-ground space resources have become increasingly tense. In order to alleviate the shortage of land resources and traffic congestion caused by the accelerated urbanization process, structures are gradually developed underground, such as underground stations, underground parking lots, and subway tunnels. In order to meet the construction requirements of buildings and structures, the excavation depth and scale of deep foundation pits (deep working wells) should be increased first. However, due to the extremely complex geological conditions in deep ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D19/06
CPCE02D19/06E02D19/08E02D19/20E02D17/02
Inventor 柴建国李敏段莉新樊秋林林集体陈明李汉愿叶茂森陈秀彬张树凯齐红海闫煜东张鹏刘磊孙立强郎瑞卿朱威
Owner 中铁十八局集团第五工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products