A technology for drainage system and pollution control, applied in waterway system, sewer system, sewage removal, etc., can solve the problems of low operation efficiency and large energy consumption, and achieve the reduction of water storage, lower operation energy consumption, and high industrial efficiency. The effect of using value
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0058] Example 1:
[0059] see Figure 1-5 , a drainage system for improving the operating efficiency of pollution control facilities, which includes a rainwater collection unit 1 for collecting rainwater and sewage, and the rainwater collection unit 1 is connected to a receiving water body through a discharge unit 3; the rainwater collection unit The unit 1 is connected with a storage tank unit 4 for water storage; the rainwater collection unit 1 is connected with a sewage treatment unit 2 for treating sewage, and the discharge end of the sewage treatment unit 2 is connected with the receiving water body ; Also includes a scheduling unit 5 for controlling scheduling. In the specific use process, the pollutant-holding capacity calculation module of the dispatching center unit calculates the dynamic pollutant-holding capacity of the receiving water body, the pollutant discharge allocation module forms a dynamic allocation of sewage discharge according to the distribution mecha...
Example Embodiment
[0060] Example 2:
[0061] see figure 2 , the rainwater collection unit 1 includes a plurality of sewage production areas 12, all of the sewage production areas 12 are connected to the confluence pipeline 11 through communication pipes;
[0062] Further, the pipe diameter of the confluent pipeline 11 is designed and constructed according to the highest peak value of the dischargeable sewage generation area 12 in the long term plus a certain amount of rainwater, and a certain amount of rainwater is at least twice the highest peak value of sewage; generally When, especially during the peak period of sewage generation in non-morning and late periods, there is a large vacant space in the confluence pipeline.
[0063] On sunny days, there is only sewage in the sewage generating area 12 in the confluent pipeline 11, and after being treated by the sewage treatment unit 2, the tail water is discharged into the receiving water body;
[0064] When it rains, the confluent pipeline 11 ...
Example Embodiment
[0065] Example 3:
[0066] see image 3 , the sewage treatment unit 2 includes a lifting pump group 21, the lifting pump group 21 is connected to the pretreatment device 23 through the inlet pipe 22, the pretreatment device 23 is connected to the biochemical treatment device 24 through the connecting pipe 26, and the drainage of the biochemical treatment device 24 The mouth is connected with a tail water outlet pipe 25.
[0067] Further, a control switch 28 is installed on the connecting pipe 26 , an override pipe 27 is installed between the pretreatment device 23 and the tail water outlet pipe 25 , and an override switch 29 is installed on the override pipe 27 .
[0068] Further, the lifting pump group 21 is composed of conventional water pumps with various water outputs, and a spare water pump with redundant capacity is also provided.
[0069] After the sewage or combined sewage is treated by the pretreatment device, its discharge concentration can be reduced; after being ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com