Underground reservoir for reconstruction of open pit mine foundation pit and construction method thereof
An underground reservoir and ore-based technology, applied in the field of concrete, to achieve the effect of optimizing the ecological environment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] An open-pit mine foundation pit reconstructed underground reservoir, the open-pit mine foundation pit reconstruction underground reservoir consists of a foundation pit floor 9, a water-resisting layer 1 around the open-pit mine foundation pit, a soil dump rockfill body in the open-pit mine foundation pit, The permeable layer 7, gravel cushion layer 6, sand cushion layer 5, and clay layer 4 laid on the top of the rockfill body in the dump site; the water-resistant layer 1 around the foundation pit of the open-pit mine and the foundation pit floor 9 form a surrounding rock seal The water storage space, the permeable layer 7 is formed by laying permeable concrete on the top of the rockfill body of the dump site, the gravel cushion 6 is laid on the permeable layer 7, and the sand cushion 5 is laid on the gravel cushion 6, A clay layer 4 is laid on the sand cushion layer 5, and the gravel cushion layer 6, the sand cushion layer 5, and the clay layer 4 form a surface permeable...
Embodiment 2
[0028] An open-pit mine foundation pit reconstructed underground reservoir, the open-pit mine foundation pit reconstruction underground reservoir consists of a foundation pit floor 9, a water-resisting layer 1 around the open-pit mine foundation pit, a soil dump rockfill body in the open-pit mine foundation pit, The permeable layer 7, gravel cushion layer 6, sand cushion layer 5, and clay layer 4 laid on the top of the rockfill body in the dump site; the water-resistant layer 1 around the foundation pit of the open-pit mine and the foundation pit floor 9 form a surrounding rock seal The water storage space, the permeable layer 7 is formed by laying permeable concrete on the top of the rockfill body of the dump site, the gravel cushion 6 is laid on the permeable layer 7, and the sand cushion 5 is laid on the gravel cushion 6, A clay layer 4 is laid on the sand cushion layer 5, and the gravel cushion layer 6, the sand cushion layer 5, and the clay layer 4 form a surface permeable...
Embodiment 3
[0030] An open-pit mine foundation pit reconstructed underground reservoir, the open-pit mine foundation pit reconstruction underground reservoir consists of a foundation pit floor 9, a water-resisting layer 1 around the open-pit mine foundation pit, a soil dump rockfill body in the open-pit mine foundation pit, The permeable layer 7, gravel cushion layer 6, sand cushion layer 5, and clay layer 4 laid on the top of the rockfill body in the dump site; the water-resistant layer 1 around the foundation pit of the open-pit mine and the foundation pit floor 9 form a surrounding rock seal The water storage space, the permeable layer 7 is formed by laying permeable concrete on the top of the rockfill body of the dump site, the gravel cushion 6 is laid on the permeable layer 7, and the sand cushion 5 is laid on the gravel cushion 6, A clay layer 4 is laid on the sand cushion layer 5, and the gravel cushion layer 6, the sand cushion layer 5, and the clay layer 4 form a surface permeable...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com