Uplink channel transmission method, terminal and base station
A channel transmission and channel technology, applied in the field of communication, can solve the problems of no clear scheme and the channel cannot be transmitted, and achieve the effect of ensuring normal transmission and improving the transmission performance of the system
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0132] Embodiment 1: There is a PUCCH and a PUSCH transmission on CC1 (Component Carrier, carrier unit) and CC2 respectively, and the PUCCH and PUSCH overlap in the time domain, wherein, the HARQ-ACK of the SPS PDSCH is carried on the PUCCH (SPS for short) HARQ-ACK), PUSCH does not have a corresponding PDCCH (that is, CG PUSCH), then:
[0133] If the terminal and the base station agree to use the above method 1, it is assumed that the DL symbols configured by high-level signaling, the symbols for downlink transmission scheduled by DCI, the indication information in the DCI used to indicate the time unit structure indicate DL or FL symbols, and SSB The symbols occupied by the transmission are all unavailable symbols, then: on the terminal side, first determine that the HARQ-ACK on the PUCCH is transferred to the PUSCH for transmission according to the multiplexing transmission rule of PUCCH and PUSCH overlap, so that the PUCCH is not transmitted, and the final transmission is ob...
Embodiment 2
[0136] Embodiment 2: There is a PUCCH and a PUSCH transmission on CC1, CC2 and CC3 respectively, and the PUCCH and the two PUSCHs overlap in the time domain, wherein the PUCCH carries SPS HARQ-ACK, and both PUSCHs are CG PUSCH, then:
[0137] If the terminal and the base station agree to use the first method above, it is assumed that the DL symbols configured by high-layer signaling, the symbols for downlink transmission scheduled by DCI, the symbols indicated as DL or FL by DCI format 2-0, and the symbols occupied by SSB transmission are all unavailable. If the symbol is used, then: on the terminal side, first determine that the HARQ-ACK on the PUCCH is transferred to one PUSCH for transmission according to the multiplexing transmission rule of PUCCH and PUSCH overlap, so that the PUCCH is not transmitted. Since there are two PUSCHs overlapping with the PUCCH, it is necessary to Select a PUSCH, according to the selection rules in the prior art (selection order from first to l...
Embodiment 3
[0142] Embodiment 3: There is a PUCCH carrying HARQ-ACK and a PUCCH carrying CSI on CC1, there is overlap between the two PUCCHs, and the HARQ-ACK is the feedback information of the PDSCH with the corresponding PDCCH, then:
[0143] If the terminal and the base station agree to use the above method 1: Assume that the DL symbols configured by high-level signaling, the symbols for downlink transmission scheduled by DCI, the indication information in the DCI used to indicate the time unit structure indicate DL or FL symbols, and SSB If the symbols occupied by transmission are all unavailable symbols, then: on the terminal side, first determine a PUCCH resource for simultaneous transmission of HARQ-ACK and CSI according to the multiplexing transmission rule of PUCCH overlap, specifically according to the total number of HARQ-ACK and CSI The number of bits, select one of the pre-configured multiple PUCCH resource sets, and in the selected PUCCH resource set, determine a PUCCH resour...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com