Transformer substation operation state research and judgment method based on regulation and control cloud

A technology of operating status and substations, applied in the direction of electrical components, circuit devices, information technology support systems, etc., can solve problems such as misjudgment, missed judgment, misjudgment, etc., and achieve the effect of improving the correct rate of research and judgment and improving the accuracy rate

Active Publication Date: 2021-04-27
STATE GRID ANHUI ELECTRIC POWER +1
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The technical problem to be solved by the present invention is to provide a method for researching and judging the operation status of substations based on the control cloud, to solve the problems of misjudgment, missed judgment, and misjudgment that are prone to occur in traditional research and judgment methods, and to creatively propose a bus voltage balance verification model, a transformer The apparent power calibration model and the AC line current calibration model integrate and control the comprehensive data of power grid operation from multiple systems, realize the association of business data, and greatly improve the accuracy of judgment

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Transformer substation operation state research and judgment method based on regulation and control cloud
  • Transformer substation operation state research and judgment method based on regulation and control cloud
  • Transformer substation operation state research and judgment method based on regulation and control cloud

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0097] Such as figure 1 As shown, a method for researching and judging the operating status of a substation based on the control cloud includes the following steps:

[0098] Step1: Read the equipment ledger data from the control cloud platform to obtain substation information and equipment information in the substation;

[0099] Step2: According to the equipment information in the substation, generate the topology connection model of the substation equipment;

[0100] Step3: Use the substation equipment topology connection model to obtain the provincial telemetry data sent by the provincial power supply company and the municipal telemetry data sent by the municipal power supply company;

[0101] Step4: Based on the connection relationship between the provincial telemetry data and the municipal telemetry data and the equipment in the substation, construct the operation status evaluation model, generate and display the evaluation report on whether the operation status is normal...

Embodiment 2

[0104] Embodiment 2: The difference between embodiment 2 and embodiment 1 is only that: the process of verifying the bus voltage balance model is described in detail.

[0105] 1. First, the remote signaling data of the circuit breaker sent to the control cloud by the municipal power supply company is used to judge the bus voltage balance verification model:

[0106] A reads the remote signaling data of the circuit breaker connected to the bus that is sent to the control cloud by the municipal power supply company,

[0107] Read the voltage data of the bus ab line sent to the control cloud by the municipal power supply company, and record it as Uc; read the rated voltage value of the bus bar as Ue, and take the bus voltage connected to the bus bar as Uc1, Uc2...

[0108] Ucn; the unit is kilovolts (kV). make

[0109]

[0110] Among them, B c is the running status of the data bus for ground adjustment, n is the number of circuit breakers connected to the bus, Yn is the rem...

Embodiment 3

[0160] Embodiment 3: The difference between embodiment 3 and embodiment 1 is only that: the process of calibrating the transformer apparent power model is described in detail.

[0161] 1. For 2-winding transformers:

[0162] 1. Read the remote signal value of the circuit breaker connected to the high-voltage side winding sent by the municipal power supply company to the control cloud from the control cloud database, denoted as Ych, and read the remote signal value of the circuit breaker connected to the low-voltage side winding as Ycl,

[0163] T c =Y ch +Y cl (10)

[0164] where T c It is the running status of the ground data transformer.

[0165] 2. Read the high-voltage side current, active power and reactive power sent to the regulating cloud by the municipal power supply company from the regulation cloud database and record them as Ich, Pch and Qch respectively, and record the low-voltage side current, active power and reactive power as Icl and reac...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a transformer substation operation state research and judgment method based on regulation and control cloud and belongs to the technical field of power transfer automation. The method comprises the following steps of step 1, reading equipment ledger data from a regulation and control cloud platform, and obtaining the information of a transformer substation and the information of equipment in the transformer substation; step 2, generating a transformer substation equipment topological connection model according to the equipment information in the transformer substation; step 3, acquiring provincial telemetry data uploaded by a provincial power supply company and municipal telemetry data uploaded by a municipal power supply company by utilizing the transformer substation equipment topological connection model; and step 4, constructing an operation state evaluation model based on the connection relationship between the provincial telemetry data and the municipal telemetry data and the equipment in the transformer substation, and generating and displaying an evaluation report about whether the operation state is normal or not. According to the method, a problem that misjudgment, missed judgment and misjudgment are likely to occur in a traditional research and judgment mode is solved, the bus voltage balance verification model, the transformer apparent power verification model and the alternating current line current verification model are creatively provided, and research and judgment accuracy is improved.

Description

technical field [0001] The invention belongs to the technical field of electric power mobilization automation, and in particular relates to a method for researching and judging the operating state of a substation based on a control cloud. Background technique [0002] There are multiple sets of data acquisition terminals on the substation site, which collect data independently and send them to the management systems of the two-level management agencies. For example, the substation in Hefei area will use different equipment to obtain data and send them to Hefei Electric Power Company and Anhui Electric Power Company respectively. . The data in the two systems do not communicate with each other. The Anhui provincial company and the Hefei city company will respectively adopt the traditional data inspection method to study and judge the data of the substation and obtain a conclusion on whether the substation is operating normally. The data values ​​received by different managem...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J13/00
CPCH02J13/00002H02J13/00034H02J13/00001Y04S10/16Y02E60/00
Inventor 汪伟章昊李端超马金辉王松梁肖陈伟沈新村李燚喆
Owner STATE GRID ANHUI ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products