Method for ecological transformation of river channel concrete embankment slope
A concrete and ecological technology, applied in land preparation methods, botanical equipment and methods, excavation, etc., can solve problems such as difficulty in loosening soil, limited operating space, unsuitable for planting green plants, etc., and achieves convenient and convenient replacement of plants. The effect of reducing labor intensity and difficulty
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] A method for ecological transformation of river concrete embankment slopes, comprising the following steps:
[0047] Step 01), mark the line on the concrete embankment slope according to the design drawings, and dig planting holes at the corresponding positions. The planting holes are circular and have a diameter of 30 cm. They are dug to penetrate the concrete layer to completely leak the soil. The minimum distance between adjacent planting holes 10 cm apart;
[0048] Step 02), pour 200ml of nutrient solution into each planting hole;
[0049] Step 03), put 2 earthworms in each planting hole;
[0050] Step 04), use a light-transmitting plate to seal the planting hole, specifically, use an acrylic plate, and use hot-melt glue to fix the connection and maintain it for 7 days;
[0051] Step 05), heat the hot melt adhesive, cancel the fixation of the light-transmitting plate, remove the light-transmitting plate, and then sow the green plant seeds in the soil of the planti...
Embodiment 2
[0057] A method for ecological transformation of river concrete embankment slopes, compared with Embodiment 1, the only difference is:
[0058]Step 01), mark and mark lines on the concrete embankment slope according to the design drawings, and dig planting holes at the corresponding positions. The planting holes are circular and 40 cm in diameter, and they are dug to penetrate the concrete layer to completely leak the soil. The minimum distance between adjacent planting holes The spacing is 20 cm;
[0059] Step 02), pour 220ml of nutrient solution into each planting hole;
[0060] Step 04), use a light-transmitting plate to seal the planting hole, specifically, use an acrylic plate, and use hot-melt glue to fix the connection and maintain it for 10 days;
[0061] Step 06), place a block of porous material in the soil of the planting hole. Specifically, the porous material is perlite with an average maximum particle size of 1.5 cm. Perlite is laid in three layers, and each lay...
Embodiment 3
[0064] A method for ecological transformation of river concrete embankment slopes, compared with Embodiment 1, the only difference is:
[0065] Step 01), mark the line on the concrete embankment slope according to the design drawings, and dig planting holes at the corresponding positions. The planting holes are circular and have a diameter of 50 cm. They are dug to penetrate the concrete layer to completely leak the soil. The minimum distance between adjacent planting holes The spacing is 30 cm;
[0066] Step 02), pour 250ml of nutrient solution into each planting hole;
[0067] Step 04), use a light-transmitting plate to seal the planting hole, specifically, use an acrylic plate, and use hot-melt glue to fix the connection and maintain it for 14 days;
[0068] Step 06), place a block of porous material in the soil of the planting hole. Specifically, the porous material is perlite with an average maximum particle size of 2 cm. Perlite is laid in three layers, and each layer c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com