Cascade reservoir power generation scheduling method and system

A cascade reservoir and dispatching method technology, applied in system integration technology, information technology support system, data processing application, etc., can solve the problem of not comprehensively considering cascade reservoir storage capacity allocation and power generation benefits, etc.

Inactive Publication Date: 2021-01-15
HUAZHONG UNIV OF SCI & TECH
View PDF8 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In view of the defects of the prior art, the purpose of the present invention is to provide a cascade reservoir power generation scheduling method and system, aiming to solve the problem that the existing cascade reservoir power generation scheduling method does not comprehensively consider the cascade reservoir storage capacity allocation and power generation benefits

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cascade reservoir power generation scheduling method and system
  • Cascade reservoir power generation scheduling method and system
  • Cascade reservoir power generation scheduling method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0123] The Xiluodu cascade reservoir and Xiangjiaba cascade reservoir in the upper reaches of the Yangtze River are now selected. The dispatch period is from July 17, 2020 to July 21, 2020. According to the upstream and downstream flood control situation, the reserved flood control storage capacity of the cascade reservoirs at the end of the dispatch period is 3.5 billion m 3 , to meet the next flood that may occur in the future. According to the reserved flood control storage capacity of the cascade reservoirs, the final water level set of the cascade reservoirs during the dispatching period is calculated through the water level-storage capacity curves of each reservoir, as shown in Table 1.

[0124] Table 1

[0125]

[0126]

[0127] Considering the initial water level, the final water level of the cascade reservoirs and the constraints of dispatching operation during the dispatching period, the total power generation of the cascade reservoirs under different final wat...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a cascade reservoir power generation scheduling method and system, and belongs to the field of reservoir optimal scheduling. The method specifically comprises the following steps: determining a cascade reservoir reserved flood control reservoir capacity distribution method set by utilizing the size of the reserved reservoir capacity at the end of a cascade reservoir scheduling period; according to the reserved flood control reservoir capacities allocated to all the reservoirs, deducing the scheduling period end water level corresponding to the reserved flood control reservoir capacities through a reservoir water level reservoir capacity curve, and forming a cascade reservoir scheduling period end water level set; establishing a power generation scheduling model taking the maximum power generation capacity of the cascade hydropower station as a target by utilizing the initial water level and the final water level of the cascade reservoir scheduling period and thepower generation flow and constraint conditions of the reservoir; and solving the power generation scheduling model by adopting a deterministic optimization scheduling method, and screening out the optimal operation mode of the cascade reservoir. By converting the reserved flood control reservoir capacity of the cascade reservoir in the drainage basin dispatching period into the water level constraint at the end of the dispatching period, the power generation benefit of the cascade reservoir is maximized on the premise of guaranteeing flood control safety, and the flood control benefit and the power generation benefit are both considered.

Description

technical field [0001] The invention belongs to the field of optimal dispatching of reservoirs, and more specifically relates to a method and system for dispatching power generation of cascaded reservoirs. Background technique [0002] Reservoirs are important infrastructures in my country. They undertake important functions such as ensuring flood control safety, water supply safety, energy safety, and food safety in river basins, and play an important role in flood control, water supply, power generation, shipping, and ecology. Large and medium-sized reservoirs generally have multiple functions such as flood control and power generation. How to maximize the comprehensive benefits of reservoir water resources while ensuring the safety of flood control in the basin is an important task. [0003] At present, when the cascade reservoir optimal dispatching model comprehensively considers the flood control benefit of the river basin and the flood control benefit of the cascade po...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/06315G06Q50/06Y02E40/70Y04S10/50Y02A10/40
Inventor 周建中仇红亚陈潇查港沈柯言李力漆瑞丰
Owner HUAZHONG UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products