Embodiment 1
[0030] Example 1 CACB1GA-3 Well Flowback Pump Negative Pressure Flowback and Blockage Removal
[0031] 1. Basic data:
[0032] ;
[0033] 2. Reservoir data:
[0034] ;
[0035] 3. Flowback pump string (such as figure 1 shown) and supporting tools:
[0036] The first oil pipe 2, the second oil pipe 6, the third oil pipe 8: N80, 89mmEU oil pipe;
[0037] Plug valve 1: 89mmEU pressure resistance 80MPa;
[0038] Packer 5: RTTS-150;
[0039] Oil drain 3: outer diameter 89mmEUE-SLP-FF25MPa;
[0040] Flowback pump 4: outer diameter 134mm inner diameter 120mm, effective stroke 7.0m, buckle type 89mmEU;
[0041] Precision microporous composite sand filter tube 7: filtration accuracy 150μm, outer diameter 108mm*5m;
[0042] Plug 9: outer diameter 89mmEU;
[0043] Supporting tools: faucet and kelly (lifting tool).
[0044] 4. Construction steps:
[0045] (1) Lower flowback string: refer to the schematic diagram of the lowering depth of the flowback pump string (such as ...
Embodiment 2
[0055] Example 2 Flowback Pump Negative Pressure Blockage Removal in Well CASH201A-20
[0056] 1. Basic data:
[0057] .
[0058] 2. Reservoir data:
[0059] .
[0060] 3. Flowback pump string (such as figure 1 shown) and supporting tools:
[0061] The first oil pipe, the second oil pipe, the third oil pipe: N89mmEU oil pipe;
[0062] Plug valve: N80, 89mmEU pressure resistance 80MPa;
[0063] Packer: RTTS-150;
[0064] Oil drain: OD 89mm EUE-SLP-FF 25MPa;
[0065] Flowback pump: outer diameter 134mm inner diameter 120mm, effective stroke 7.0m, buckle type 89mmEU;
[0066] Precision microporous composite sand filter tube: filtration accuracy 150μm, outer diameter 108mm*5m;
[0067] Plug: outer diameter 89mmEU;
[0068] Supporting tools: faucet and kelly (lifting tool).
[0069] 4. Construction steps:
[0070] (1) Lower flowback string: refer to the tool depth of the flowback pump string schematic diagram (such as Figure 4 As shown) connect the pipe string, se...
Embodiment 3
[0080] Example 3 Technical comparison with the existing flowback process
[0081] The flowback and blockage removal method currently adopted is the nitrogen foam flowback and blockage removal method, but its cost is relatively high, and since it is applied in new and old offshore wells, it is easily subject to the larger constraints of flowback tanker working conditions and marine weather. Compared with it, the present invention The negative pressure flowback method provided by the flowback pump has significant advantages in terms of the cost of the mobile platform, the integration of mining and repairing platform, construction equipment, and construction period, as shown in Table 3.
[0082] Table 3 Construction items and cost data
[0083] .
[0084] In addition to the significant advantages in terms of construction projects and costs, the safety and risk points of the entire project were also compared, as shown in Table 4:
[0085] Table 4 Flowback Risk Points
[0086]...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com