Method for obtaining crack height by using fracturing construction pump stop pressure data
A technology of crack height and pump pressure, used in electrical digital data processing, earthwork drilling, complex mathematical operations, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0118] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
[0119] see Figure 1-8 As shown, the present invention is a method for obtaining the fracture height by using the pump stop pressure data of fracturing construction, comprising the following steps:
[0120] Step 1: According to the amount of fracturing fluid injected during fracturing construction, establish a seepage model of fracturing fluid in the formation;
[0121] Step 2: According to the seepage model, obtain the bottomhole pressure solution after the pump ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com