Super high-rise building inhaul cable type flexible steel platform formwork and lifting method

A construction cable-type, steel platform technology, used in buildings, building structures, formwork/formwork/work frames, etc., can solve the problem of reduced climbing speed and climbing efficiency, difficult to effectively evaluate safety, and difficult to withstand use loads, etc. problems, to achieve the effect of eliminating height restrictions, achieving multi-floor continuous climbing, and increasing the height of a single climb

Active Publication Date: 2020-06-05
SHANGHAI CONSTRUCTION GROUP
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

When the overall load is greater, the requirements for corbels or load-bearing components are higher, and the components are changed from force limitation to deformation limitation, and the rigidity requires the section of the component to increase continuously, making it difficult for the steel platform formwork equipment to withstand excessive loads
At the same time, because the internal force of the corbel or load-bearing members is difficult to effectively measure, it is difficult to effectively evaluate the safety during the operation process and climbing process
[0005] At the same time, whether it is the lifting type or the jacking type, there is a problem of lifting the auxiliary member column under pressure and instability, which will limit the single climbing height of the steel platform formwork equipment, making each climbing a small distance , it is necessary to re-switch the force system and check the synchronization, so that the climbing speed and climbing efficiency are greatly reduced

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Super high-rise building inhaul cable type flexible steel platform formwork and lifting method
  • Super high-rise building inhaul cable type flexible steel platform formwork and lifting method
  • Super high-rise building inhaul cable type flexible steel platform formwork and lifting method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0046] combine figure 1 with figure 2 As shown, a cable-type flexible steel platform formwork for a super high-rise building provided in this embodiment includes a steel platform 2, a steel platform overhanging corbel 9, a column support structure 3, a column corbel 10, a connecting truss 7, a top Lift oil cylinder 8, oil cylinder corbel 11, main cable 5 and some adjustable stay cables 6.

[0047] The column corbel 10 is arranged on the side of the column support structure 3 for supporting the column support structure 3 on the inner wall of the core tube shear wall 1 . The contact truss 7 is set horizontally, and the two ends are respectively fixedly connected with the column support structures 3 on both sides, such as figure 1 As shown, a horizontal connection truss 7 is provided on the top and bottom of the two column support structures 3 to provide horizontal support for the column support structures 3. If the height of the column support structures 3 is very high, it ma...

Embodiment 2

[0059] This embodiment provides a method for lifting a cable-type flexible steel platform formwork for a super high-rise building. Figure 1 to Figure 3 The promotion method is described further. The lifting method comprises the steps of:

[0060] Adjust the effective length of the adjustable cable 6 so that the adjustable cable 6 is in a stressed state, and the steel platform 2 is supported by the adjustable cable 6;

[0061] The outrigger 9 of the steel platform is withdrawn from the shear wall 1 of the core tube;

[0062] Gradually shorten the effective length of the adjustable cable 6, control the upward lifting speed of the steel platform 2, and after the steel platform 2 is lifted in place, insert the steel platform outstretched corbel 9 into the core tube shear wall 1, and the core tube shear wall 1 Provides vertical support.

[0063] Since the height of the column support structure 3 is relatively high, multiple climbing of the steel platform 2 can be realized. How...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a super high-rise building inhaul cable type flexible steel platform formwork and a lifting method. The steel platform formwork comprises a steel platform, outward extending corbels of the steel platform, upright post supporting structures, upright post corbels, a connecting truss, jacking oil cylinders, oil cylinder corbels, a main cable and a plurality of adjustable inhaul cables; and the steel platform is supported on an outer side wall body of a core barrel shear wall through the outward extending corbels of the steel platform, the upright post support structures are supported on an inner side wall body of the core barrel shear wall through the upright post corbels at the side parts, the jacking oil cylinders are arranged at the bottoms of the upright post support structures and are supported on the inner side wall body of the core barrel shear wall through the oil cylinder corbels, the two ends of the main cable are respectively connected with the tops ofthe two upright post support structures, and the plurality of adjustable inhaul cables are used for lifting the steel platform. According to the steel platform formwork and the lifting method, a mainclimbing member of the steel platform is converted into a tension member from a compression member, the compression support is separated from the climbing member, and the limitation of a climbing height per time is not needed to be considered.

Description

technical field [0001] The invention relates to a cable-type flexible steel platform formwork for super high-rise buildings and a lifting method, belonging to the technical field of super high-rise steel platform formwork. Background technique [0002] Steel platform formwork equipment is one of the construction equipment commonly used in super high-rise building structures in recent years. The existing steel platform formwork equipment is divided into two types: jacking type and lifting type, both of which use the overall steel frame, platform slab, scaffolding system, etc. to provide a closed construction work surface, making full use of the characteristics of the strong bearing capacity of the steel structure ; Use the hydraulic cylinder to provide the driving force to make the formwork equipment climb up along the core tube of the super high-rise building. The steel bars required for the construction of the core tube can be stacked on the top working plane of the steel ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E04G11/28
CPCE04G11/28
Inventor 龚剑赵一鸣房霆宸左俊卿吴联定杨佳林
Owner SHANGHAI CONSTRUCTION GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products