[0051] like figure 1 As shown, the present embodiment is a method for protecting cables with a Bailey frame, and the steps include:
[0052] S1: Measure and locate the cable pipe trench before excavating the subway foundation pit, and excavate the soil above the cable pipe trench;
[0053] S2: building a foundation pit continuous wall at both ends of the cable trench and reinforcing the outside of the foundation pit continuous wall;
[0054] S3: setting Bailey frame foundations at both ends of the cable trench and above the continuous wall of the foundation pit;
[0055] S4: Excavating trenches on both sides of the cable pipe trench, setting a Bailey frame on the basis of the Bailey frame, and placing the suspension structure of the Bailey frame in the groove;
[0056] S5: Starting from one side of the subway foundation pit, excavate the soil below the cable pipe trench step by step along the length direction of the cable pipe trench, and excavate the soil below the cable pi...
Embodiment 2
[0081] The method of embodiment 1 is applicable to a kind of Bailey frame protection cable system provided by this embodiment, combined with figure 2 , 3 As shown, in this embodiment, the system includes a cable duct trench 1, several transverse steel sections 2, a subway foundation pit 3, at least two Bailey frames 4, at least four Bailey frame foundations 5, crown beams 6 and A number of reinforced foundations 7, the subway foundation pit 3 includes the subway foundation pit main body, the subway foundation pit continuous wall 8 and the subway foundation pit bottom surface; On the top of the wall 8, the Bailey frame 4 is arranged on two Bailey frame foundations 5 respectively, the underside of the Bailey frame 4 is provided with a suspension structure 9, and the lower side of the cable pipe trench 1 is provided with several transverse section steels 2, and the horizontal The two ends of the section steel 2 are respectively connected with the suspension structures 9 of the ...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com