Forecast scheduling method for reducing reservoir flood regulation starting water level by considering forecast errors
A scheduling method, flood control scheduling technology, applied in forecasting, genetic rules, weather condition prediction, etc., can solve the problem that the scheduling effect is not necessarily optimal
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0076] The method for determining the flood control forecast dispatching rules for lowering the flood starting water level of the reservoir considering the flood forecast error proposed by the present invention is mainly divided into two parts: the design of the pre-discharging scheme for lowering the starting water level, and the optimization of the dispatching rules considering the forecast error distribution. The present invention takes the Nierji Reservoir as an example, and describes the specific implementation in detail in combination with technical solutions and accompanying drawings. Specifically include the following steps:
[0077] In the first step, based on the flood forecasting scheme for the reservoir's control basin and downstream intervals, determine the discriminant indicators for flood control forecasting, dispatching and pre-discharging.
[0078] In order to improve the flood control benefit of Nierji Reservoir, the present invention firstly analyzes the acc...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com