10kV centrally installed switchgear circuit breaker tester

A central cabinet and circuit breaker technology, applied in circuit breaker testing, instruments, measuring devices, etc., can solve the problems of dense aviation plug terminals, inaccurate test data, and difficulty in removing relays, avoiding the removal of latching relays, Reduce wiring work and avoid the effect of manual energy storage

Pending Publication Date: 2020-03-20
HEBI POWER SUPPLY OF HENAN ELECTRIC POWERCORP
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] During the test of the 10kV central cabinet circuit breaker, the switch needs to be pulled to the maintenance position. At this time, the aviation plug between the handcart circuit breaker and the switch cabinet is disconnected, the energy storage power supply is disconnected, the closing circuit is blocked, and manual energy storage is required. , open the front panel of the handcart circuit breaker, and remove the blocking relay, but the relay is difficult to remove, time-consuming and laborious, and when wiring, the internal terminals of the aviation plug are dense, which is prone to accidental touch, resulting in short-circuit damage to the circuit breaker or inaccurate test data , In addition, two tests of switching characteristics and insulation resistance are required for circuit breaker debugging. The conventional method is to use two sets of instruments to test in turn. The disconnection and wiring in the middle are cumbersome and time-consuming. We combine the functions of the two sets of instruments to reduce the work of disconnection , save time; therefore, it is very necessary to provide a 10KV central cabinet circuit breaker tester with reasonable structure, high work efficiency and reduced wiring work

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • 10kV centrally installed switchgear circuit breaker tester
  • 10kV centrally installed switchgear circuit breaker tester
  • 10kV centrally installed switchgear circuit breaker tester

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0018] Such as Figure 1-4 As shown, the 10KV central cabinet circuit breaker tester includes an instrument case 1, and the upper part of the instrument case 1 is provided with an output terminal 2, a display panel 3, an operation panel 4 and a power switch 5 from left to right. The output terminal 2 is connected to the integrated board 14 through the terminal connection line 17, the integrated board 14 is arranged inside the instrument housing 1, the display panel 3 is connected to the integrated board 14 through the display panel connection line 16, and the operation panel 4 is operated The panel connection line 18 is connected to the integrated board 14, the power switch 5 is respectively connected to the energy storage power supply 10 and the integrated board 14, and the aviation joint connecting line 15 is arranged under the integrated board 14, and the other end of the aviation joint connecting line 15 Connected to the aviation joint 7, the aviation joint 7 is arranged o...

Embodiment 2

[0021] Such as Figure 1-4 As shown, the 10KV central cabinet circuit breaker tester includes an instrument case 1, and the upper part of the instrument case 1 is provided with an output terminal 2, a display panel 3, an operation panel 4 and a power switch 5 from left to right. The output terminal 2 is connected to the integrated board 14 through the terminal connection line 17, the integrated board 14 is arranged inside the instrument housing 1, the display panel 3 is connected to the integrated board 14 through the display panel connection line 16, and the operation panel 4 is operated The panel connection line 18 is connected to the integrated board 14, the power switch 5 is respectively connected to the energy storage power supply 10 and the integrated board 14, and the aviation joint connecting line 15 is arranged under the integrated board 14, and the other end of the aviation joint connecting line 15 Connected to the aviation joint 7, the aviation joint 7 is arranged o...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a 10KV centrally installed switchgear circuit breaker tester. The instrument comprises an instrument shell, an output terminal, a display panel, an operation panel and a powerswitch are sequentially arranged at the upper part of the instrument shell from left to right; the output terminal is connected with the integrated board through a terminal connecting wire; the integrated board camera is arranged in the instrument shell; the display panel is connected with the integrated board through a display panel connecting line. The operation panel is connected with the integrated board through an operation panel connecting line. The power switch is connected with the energy storage power supply and the integrated board. An aviation joint connecting wire is arranged below the integrated board; wherein one end of the aviation connector connecting wire is connected with the instrument shell, the other end of the aviation connector connecting wire is connected with theaviation connector, the aviation connector is arranged on the instrument shell, the energy storage power supply is arranged in the instrument shell and is further connected with the energy storage interface through the power supply connecting wire, and the energy storage interface is arranged on the instrument shell. The invention has the advantages of reasonable structure, high working efficiencyand reduced wiring work.

Description

technical field [0001] The invention relates to the technical field of electrical equipment, in particular to a 10KV central cabinet circuit breaker tester. Background technique [0002] During the test of the 10kV central cabinet circuit breaker, the switch needs to be pulled to the maintenance position. At this time, the aviation plug between the handcart circuit breaker and the switch cabinet is disconnected, the energy storage power supply is disconnected, the closing circuit is blocked, and manual energy storage is required. , open the front panel of the handcart circuit breaker, and remove the blocking relay, but the relay is difficult to remove, time-consuming and laborious, and when wiring, the internal terminals of the aviation plug are dense, which is prone to accidental touch, resulting in short-circuit damage to the circuit breaker or inaccurate test data , In addition, two tests of switching characteristics and insulation resistance are required for circuit brea...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G01R31/327G01R1/04G01R27/02
CPCG01R1/04G01R1/0416G01R27/025G01R31/3274
Inventor 胡娟杨明黄清江徐晓光王立立郭孝忠郝学敏毛哲龙邓旗
Owner HEBI POWER SUPPLY OF HENAN ELECTRIC POWERCORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products