Integrated optimization method for high-speed railway train operation diagram and motor train unit application
A technology for train diagrams and high-speed railways, applied in data processing applications, instruments, predictions, etc., can solve problems affecting planning, train diagrams, and EMU operation optimization, such as unsatisfactory results and poor results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0069] Such as figure 1 As shown, embodiment 1 of the present invention provides a kind of high-speed railway train running diagram and EMU operation integration optimization method, including the following process steps:
[0070] Step S110: constructing an integrated space-time connection network;
[0071] Step S120: Describe the running path of the EMU according to the integrated space-time connection network;
[0072] Step S130: Establishing an integrated optimization model with a block diagonal structure according to the running path of the EMU;
[0073] Step S140: Solving the optimization model based on the Lagrangian relaxation algorithm to obtain the intersection and high-speed railway train diagrams.
[0074] The step S110 specifically includes:
[0075] Set up a node; Wherein, the node includes a virtual starting point, a station arrival node, a station departure node and a virtual end point; the node includes a time attribute, a space attribute and a state attribu...
Embodiment 2
[0120] Embodiment 2 of the present invention provides an integrated optimization method for high-speed railway train operation diagram and EMU operation, comprising the following steps:
[0121] Step 1. Construction of an integrated space-time connection network describing the running path of the EMU; input the road network parameters, operating line parameters and EMU parameters of the integrated time-space connection network into the input data interface in the computer program. Among them, the road network parameters include the set of stations and stations, the set of intervals and intervals, the mileage of intervals, the additional time of cars at stations, and the additional time of parking at stations; the parameters of operating lines include train operating lines and sets of operating lines, and sets of stations on train paths , the starting station of the train, the final arrival station of the train, the departure time window of the train at the starting station, the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com