A construction method for a prefabricated building

A construction method and prefabricated technology, applied in buildings, building components, sustainable buildings, etc., can solve problems such as time-consuming and labor-intensive installation and disassembly, and achieve the effects of inconvenient disassembly, low cost, and reduced environmental pollution

Active Publication Date: 2020-11-27
CHINA FIRST METALLURGICAL GROUP
View PDF7 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] One of the purposes of this application is to provide a construction method for a prefabricated building, which aims to improve the time-consuming and labor-intensive problem of installing and dismantling temporary buildings in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method for a prefabricated building
  • A construction method for a prefabricated building
  • A construction method for a prefabricated building

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0036] Please refer to figure 1 , with reference to Figure 2 to Figure 4 , the present application provides a prefabricated building room 1, which mainly includes a foundation floor 2, a plurality of first fixing piles 3 for fixing the foundation floor 2, a plurality of prefabricated wall panels 4 and a plurality of anti-overturning ground beams 5; The base plate 2 is provided with a plurality of first reserved fixing grooves 7, the first fixed piles 3 are installed in the first reserved fixing grooves 7, and the gaps between the first fixed piles 3 and the first reserved fixing grooves 7 are poured for A plurality of first fixed piles 3 are extended and fixed in the soil layer for the waterproof cementitious material piles that are fixedly connected to the two; at the same time, a plurality of reserved positioning grooves 8 are opened on the base plate 2, and the plurality of reserved positioning grooves 8 A prefabricated wall panel 4 is installed; a plurality of anti-overt...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The application provides a prefabricated building room and a construction method thereof, and belongs to the field of buildings. The prefabricated building room comprises a foundation bottom plate, aplurality of first fixed piles, a plurality of prefabricated panels, a plurality of anti-overturning ground beams and a plurality of second fixed piles, wherein the first fixed piles are used for fixing the foundation bottom plate, are separately mounted on the foundation bottom plate at intervals, and extend into and are fixed into a soil layer; the prefabricated panels are fixed on the foundation bottom plate at intervals; the anti-overturning ground beams are mounted on the peripheral side of the foundation bottom plate; and the second fixed piles are used for fixing the anti-overturning ground beams, are separately mounted on the anti-overturning ground beams at intervals, and extend into the soil layer. The device is convenient to assemble, wide in application range, environment-friendly, energy-saving, and high in structure stability.

Description

technical field [0001] The present application relates to the construction field, in particular to a construction method for a prefabricated building. Background technique [0002] In recent years, with the rapid development of the construction industry, there are more and more urban buildings, and a large amount of construction waste is generated during the construction process, which runs counter to the increasing cultural living standards. In the past, temporary construction houses usually used a combination of cast-in-place foundation beams and floor plates. The prefabricated foam board produces a large amount of garbage that is difficult to handle during installation and use. Although it is light during the installation process, the electrical pipelines at some installation locations need to be cut temporarily, which will affect the use process. The partition board is slightly insufficient during disassembly. , it is easy to be damaged when it is disassembled, which aff...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04B1/00E02D27/14E04B1/343H02S20/30E04C2/52E02D5/28E02D5/62
CPCE02D5/28E02D5/62E02D27/14E04B1/0007E04B1/34315E04B1/34321E04C2/523H02S20/30Y02B10/10Y02E10/50
Inventor 徐攀杨多娇杨德志龚俊邓波
Owner CHINA FIRST METALLURGICAL GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products