Method for monitoring equipment layout in railway system service facilities based on TOPSIS method
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0066] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments. The specific embodiments described below are only used to explain the present invention, and are not used to limit the scope of the present invention. After reading the present invention, those skilled in the art will fall within the scope of the present application to the modifications of various equivalent forms of the present invention The scope defined by the appended claims.
[0067] The present invention utilizes a method based on the TOPSIS method to monitor equipment layout of railway system service facilities, optimizes parameters of monitoring candidate nodes, and provides an optimized railway system operation status monitoring equipment layout scheme.
[0068] Table 1 Calibration content of simulation model parameters
[0069] parameter name details infrastructure configuration Configuration of elevators, stairs, en...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com