A water level gauge for river engineering test and its parameter calibration method

A technology for river engineering test and water level gauge, which is applied in the field of river engineering test water level gauge and its parameter calibration, can solve the problems of time-consuming installation of fixed water level gauge, high cost, influence on measurement accuracy, etc., so as to reduce observation links and human factors, reduce Labor cost and time, the effect of accurate water level measurement

Active Publication Date: 2021-01-05
CHONGQING JIAOTONG UNIVERSITY
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the above two fixed water level gauges can only measure the water level of one measuring point, while the general mountain waterway model needs more than 200 measuring points, so there will be the following technical problems: First, the cost of measuring instruments has increased significantly and occupies a large amount of water. It is very difficult to arrange the test space in the test site; second, the position of the measuring points is often changed during the test due to program optimization and other reasons, and most of the measuring points cannot be foreseen in advance, so it is difficult to use fixed water level gauges for measurement; third, the installation of fixed water level gauges is very time-consuming , will greatly prolong the test and research time; fourth, due to too many and too dense measuring instruments, collisions and displacements often occur during the test process, and it often takes a lot of time to re-check the zero point, which also affects the measurement accuracy
[0005] (1) Labor-intensive: Due to the need for follow-up reading of the level gauge, the measurement generally requires 5 people to complete at the same time (level reading, recording, leveling rod control, precise positioning, water level gauge reading)
[0006] (2) Time-consuming: Since each measuring point of the level follow-up method needs to be re-measured at the zero point, and the observation time of the focus, direction, and leveling of the level is relatively long, and a working condition requires a large number of measuring points. There are many observation links, and a working condition takes a long time, which is very time-consuming
[0007] (3) Limited accuracy: due to many observation links, most of which are manual links, the measurement accuracy is significantly affected

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A water level gauge for river engineering test and its parameter calibration method
  • A water level gauge for river engineering test and its parameter calibration method
  • A water level gauge for river engineering test and its parameter calibration method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0045] The present invention will be further described in detail below in conjunction with the accompanying drawings.

[0046] This example is attached figure 1 As shown, a river engineering test water level gauge includes an integrated box 4, a water tank 2 and a bracket located below the water tank 2. The bracket includes a disc 7, a floating disc 9 and a reference disc 11 arranged in sequence from top to bottom. The disc 7 , The disk surfaces of the floating disk 9 and the reference disk 11 are parallel to each other, and the disk 7 adopts a steel disk 7 with a diameter of 80mm and a thickness of 6mm, and the center of the disk 7 has a first circular hole with a diameter of 11mm; the floating disk 9 A steel disk 7 with a diameter of 100 mm and a thickness of 6 mm is used. The center of the floating disk 9 has a second circular hole 18 with a diameter of 11 mm. There are three small circular holes around the second circular hole 18; the area of ​​the floating disk 9 is the s...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a river engineering test water level gauge and a parameter calibration method thereof. The water level gauge includes a water level measuring device, a water tank, a probe for measuring the reference water level of the water tank, and a pressure sensor connected with the water tank and used for measuring the water outlet pressure of the water tank. A floating plate is fixedly arranged under the pressure sensor, and an ultrasonic probe opposite to the pressure sensor runs through the center of the floating plate, and both the ultrasonic probe and the pressure sensor are electrically connected to the water level measuring device. The parameter calibration method includes measuring the water level of the water cylinder z 盛水量筒 ; Measure the reference water level of the water tank z a , the vertical distance between the end face of the pressure sensor and the reference water level h 1 , the vertical distance between the end face of the ultrasonic probe and the water surface of the measuring cylinder h ;pass h 2 = z a - z 盛水量筒 - h 1 - h Obtain the vertical distance between the end face of the ultrasonic probe and the end face of the pressure sensor h 2 . Significantly reduce the observation links and human factors of the level follow-up method, reduce the influencing factors of the observation accuracy, and improve the observation accuracy.

Description

technical field [0001] The invention relates to the technical field of water conservancy engineering measurement, in particular to a river engineering test water level gauge and a parameter calibration method thereof. Background technique [0002] As one of the basic hydrological elements indicating the flood conditions of rivers and reservoir areas, water level is an important part of water regime information and an important basis for flood control scheduling and flood forecasting. Therefore, water level has always been the main content of water conservancy engineering research, a necessary parameter for flood control, channel and bridge engineering design, and a must-measure content for hydraulic and river engineering model test research. [0003] At present, the instruments used for water level measurement of hydraulic and river engineering models mainly include stylus water level gauges, ultrasonic water level gauges, etc. Among them, the stylus water level gauge measur...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): G01F25/00G01F23/296
CPCG01F23/296G01F25/20
Inventor 许光祥蒋孜伟刘添宇
Owner CHONGQING JIAOTONG UNIVERSITY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products