Arrangement method of exploration survey lines for railway tunnel with airborne electromagnetic method
An aviation electromagnetic and layout method technology, which is applied in the direction of electric/magnetic exploration, measurement device, radio wave measurement system, etc. The effect of quality and precision, reduced number of layouts, and labor saving
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Example 1—Exploration Test of Airborne Electromagnetic Method in Zheduoshan Tunnel of Sichuan-Tibet Railway
[0038] (1) Purpose of the test
[0039] From December 22, 2018 to January 28, 2019, an airborne electromagnetic exploration test was carried out in the AK289+000-AK270+000 section of the Zheduoshan Tunnel on the Sichuan-Tibet Railway. The Zheduo Mountain Tunnel is located in an area with convenient transportation. Before the test work, ground audio magnetotelluric survey work has been carried out in most sections of the test section. The purpose of the airborne electromagnetic exploration test is to:
[0040] 1. In the exploration of main lithological boundaries and geological structures, especially in the detection of fault occurrences (apparent dip angles) and the buried depth and scale of broken, weak or water-rich rock masses, it is necessary to focus on interpreting data within the height range of the tunnel, which is the tunnel Design provides basic info...
Embodiment 2 and Embodiment 3
[0073] Example 2 and Example 3—Airborne Electromagnetic Surveying of Chaluo Tunnel and Zilashan Tunnel on Sichuan-Tibet Railway
[0074] (1) Exploration purpose
[0075] The Chaluo Tunnel and the Zila Mountain Tunnel are explored by the airborne electromagnetic method, with the purpose of ascertaining the main lithological boundaries, geological structures, especially fault occurrences (apparent dip angles) and fractured, weak, karst-developed or water-rich rocks In order to provide basic data for tunnel design, we should focus on interpreting data within the range of tunnel height and elevation.
[0076] (2) Geological profile
[0077] ①Chaluo Tunnel
[0078] The Chaluo Tunnel is located between Xide Village, Chaluo Township, Batang County, Ganzi Prefecture, and Moxi Village, Songduo Township, Batang County, with a total length of 11870m. 1460m.
[0079] The Quaternary Holocene system overlying the tunnel surface is alluvial and diluvial (Q 4 al+pl ) silty clay, pebble ...
PUM
Property | Measurement | Unit |
---|---|---|
Length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com