Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for improving on-site construction efficiency by adopting virtual-real combined engineering

A technology of on-site construction and combination of virtual and real, applied in the input/output of user/computer interaction, data processing application, image data processing, etc. Engineering problems, the effect of shortening the construction period

Inactive Publication Date: 2019-06-21
BEIJING UNIV OF TECH
View PDF10 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Enterprises can use BIM building information model technology to detect project quality and help predict project time-consuming, but project quality, time-consuming and personnel safety are also closely related to the proficiency and technology of actual construction personnel, while enterprises are detached from actual projects. It is difficult to train construction personnel, that is, the defect of BIM building information modeling technology, that is, it is impossible to convert a large amount of generated data with actual construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for improving on-site construction efficiency by adopting virtual-real combined engineering

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0020] First, use all the data of the equipment that needs to be modeled and use the BIM building information model technology to establish the BIM model. In detail, first use 3D modeling software such as Revit to complete the creation and combination of preliminary 3D models according to various parameters of equipment and construction machinery and all plan, elevation, and section views. , and then modify the scale, modify the millimeter unit system in Revit to the meter unit system corresponding to UC-WIN-ROAD, so that the files of the two software can be used and are in line with each other. After the above work is completed, the model and Materials are saved to the same folder for export, and the export format is 3DS. Then import the 3DS format files into UC-WIN-ROAD. It is required to put all the files in the same folder at this time, then load the 3D model, click 3DS to find the 3DS model exported by the architectural design software. After exporting the model successf...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for improving on-site construction efficiency by adopting virtual-real combined engineering, and belongs to the technical field of buildings. According to the method,software such as BIM and the like is utilized; Processing equipment or engineering machinery on engineering is modeled, and related operation steps and technological methods are integrated into VR operation steps, so that workers directly operate virtual equipment or machinery to carry out production training or examination, and then a real object is directly operated on the engineering. The maininnovation points are that the BIM technology and the VR technology are combined, and the BIM and VR virtual combination technology is applied to construction of a new airport, so that the engineeringfeasibility and the construction efficiency are improved.

Description

[0001] Technical field: [0002] The invention relates to a construction improving method for an engineering site combining virtual and real, and belongs to the technical field of construction. [0003] Background technique: [0004] Under the circumstances of the current construction industry, construction companies and the government pay more and more attention to the quality of the project, the safety of personnel during the construction process, and the speed of completion of the project. The quality and time of the project directly affect the interests of the enterprise. During construction, workers The security of the enterprise directly affects the survival of the enterprise. Under such market conditions, construction companies and the society are paying more and more attention to BIM building information modeling technology. BIM building information modeling technology is a digital model of a construction project with both physical and functional characteristics, and it...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/20G06F3/01G06T17/05G06T19/00G06Q50/08
Inventor 赵雪锋高奇刘占省吴占明吴瑞嘉刘晓睿宫逸飞莫钰峰何敬科
Owner BEIJING UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products