Method for realizing pile foundation scheme optimization by applying a geological exploration data rapid reading system

A technology of system implementation and optimization method, applied in electrical digital data processing, special data processing applications, instruments, etc., can solve the problems of inability to achieve refined design, increase project cost, overestimate project cost, etc., to avoid secondary input. The effect of working, reducing workload, reducing design waste

Active Publication Date: 2019-06-04
杭州中联筑境建筑设计有限公司
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Due to the large amount of hole point data, the design unit needs to manually input it into the software after receiving the geological survey report, which is time-consuming and laborious, and there is also the possibility of input errors. The work may take several days or even longer, and the hole point calculation and the basic overall calculation, because the software is different and the file format is different, this entry work has to be done twice, which seriously affects the work efficiency; because the input process is too cumbersome, the hole During the overall analysis of points or foundations, designers often select relatively unfavorable or typical individual hole points for input program calculation based on visual geological survey reports. This is based on the designer’s personal subjective judgment. For complex geological conditions, construction For projects with large sites, this method is easy to miss key points and cause hidden dangers; at present, the basic plan is evaluated based on multiple conditions, and then it is drafted based on experience and then verified by trial calculation. The verification process often has partial dissatisfaction and needs to be adjusted repeatedly Finally, the results meet the safety, practicability and economy several times. This adjustment is also time-consuming and laborious, and there is a certain requirement for the experience of the designer. Since the selection of the pile foundation is based on experience, the calculation cannot exactly meet the specification standards. A certain margin and a conservative design often cause unnecessary waste and increase the project cost
[0004] Therefore, the existing pile foundation scheme design process requires manual input of geological survey data, low work efficiency, too much reliance on the designer's personal subjective judgment, unable to achieve refined design, easy to overestimate the project cost, and cause waste of materials

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for realizing pile foundation scheme optimization by applying a geological exploration data rapid reading system
  • Method for realizing pile foundation scheme optimization by applying a geological exploration data rapid reading system
  • Method for realizing pile foundation scheme optimization by applying a geological exploration data rapid reading system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0031] Embodiment: using the geological survey data fast reading system to realize the pile foundation scheme optimization method, including the following steps:

[0032] A. Read data: the dwg graphics or txt files, respectively, such as figure 1 and figure 2 shown, where figure 1Middle fill soil layer, muddy silty clay layer, clay layer, silty clay layer, silt interbedded with silt layer I and silt interbedded with silt sand II layer are respectively arranged with decreasing elevation. The language compilation applet is read into the excel document with one click, and then input the name, number, pullout coefficient, characteristic value of limit lateral resistance and characteristic value of limit end resistance of each soil layer provided by the geological survey report. The final result of data reading is as follows: image 3 shown;

[0033] B. Draw as Figure 4 , Figure 5 The calculation table shown, for clarity, Figure 4 Page a with Figure 5 Page b in middle i...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for realizing pile foundation scheme optimization by applying a geological exploration data rapid reading system. The method comprises the following steps: A, readingdata; B, drawing a calculation table, and calculating the characteristic value of the vertical bearing capacity of the single pile at each hole point; C, merging to form a plurality of subsection areas, and dividing the subsection areas into a plurality of pile types; D, drawing a curve of the ratio of the pile length to the designed bearing capacity of the single pile and a curve of the ratio ofthe pile length to the engineering cost of the single pile to obtain a curve of the ratio of the designed bearing capacity of the single pile to the engineering cost of the single pile, and finally obtaining the relation between the pile length of the pile type and the total cost according to the known total bearing capacity; And E, storing the hole point data into a dz file which can be identified and read by interference modeling software through a vba language compilation applet. The method has the advantages that geological exploration data are directly read, the working efficiency is improved, the hole point calculation result can be analyzed through one key, fine design is achieved, the calculation result is direct and accurate, and unnecessary design waste is reduced.

Description

technical field [0001] The invention relates to a pile foundation scheme optimization method, in particular to a pile foundation scheme optimization method realized by using a geological survey data fast reading system. Background technique [0002] The pile foundation has a high bearing capacity and a wide range of applications, and is currently the most widely used form of deep foundation. At present, the general process of pile foundation design is that the geological survey unit first conducts site survey and submits a report, and the designer analyzes the geological survey report, grasps the site characteristics in general, and calculates and analyzes each exploration hole According to the data in the report, input the data of each hole point into morgain or similar structural calculation software for calculation), the upper structure calculates and transmits the load to the foundation, according to the load conditions and taking into account the economy, select the pil...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50
CPCY02A90/30
Inventor 金浩天金卫明
Owner 杭州中联筑境建筑设计有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products