Non-closed continuous lifting plunger drainage device and non-closed continuous lifting plunger drainage construction method
A plunger, continuous technology, applied in the field of natural gas development, can solve the problems affecting the production efficiency of gas wells, and achieve the effect of prolonging the self-spraying period and improving the ability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0014] In order to better understand the present invention, the present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0015] The invention aims at putting the plunger into the production pipe string without shutting down the well and waiting for the plunger to go down when the gas well is in production. In the case of normal production, it can still be smoothly lowered to the position of the retainer. Under the action of its own gravity and inertia, when the plunger of the projectile shrinks down to the position of the retainer, the lower plunger of the plunger hits the retainer. , so that the upper and lower bullets expand, form a seal with the inner wall of the pipe string, and run upwards under the upward pressure of the gas well wellbore, so as to realize the drainage and recovery technology that the gas well is put in without shutting down the well, and the bullets are automatically opened after they are in place...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com