Construction method for utilizing multi-suspension cable crane to transfer bridge deck in limited mountainous area
A construction method and bridge deck technology, which are applied in the directions of bridges, bridge construction, erection/assembly of bridges, etc., to achieve the effects of short construction period, convenient construction, and reduction in the amount of load-bearing cables
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The following will be combined with Figure 1-Figure 2 The present invention is described in detail, and the technical solutions in the embodiments of the present invention are clearly and completely described. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0022] Through improvement, the present invention provides a construction method for using multi-suspension-point cables to lift and transport bridge decks in mountainous areas with limited sites; the present invention is mainly used to solve the problem of assembling orthotropic steel bridge decks by using approach bridges in the construction process of suspension bridges in restricted mountainous areas transfer problem.
[0023] When this p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com