Reservoir scheduling risk group decision-making method under incomplete information condition
A dispatching risk and group decision-making technology, applied in instruments, climate change adaptation, data processing applications, etc., can solve the problems of lack of flexibility, affecting the scientificity, effectiveness and low reliability of reservoir dispatching decisions
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0079] The technical solutions of the present invention will be described in detail below through embodiments in conjunction with the drawings.
[0080] Such as figure 1 As shown, a risk-based group decision-making method for reservoir operation under the condition of incomplete information includes the following steps:
[0081] (1) Establish a multi-objective optimal scheduling model for reservoir scheduling, and obtain a set of non-inferior solutions.
[0082] The optimization goals of the reservoir multi-objective optimization dispatching model are the maximum flood control safety of the reservoir and the minimum maximum discharge flow of the reservoir. The non-dominated sorting genetic algorithm is used to solve the above-mentioned multi-objective optimal scheduling model and generate a set of non-inferior reservoir scheduling schemes.
[0083] For reservoirs that undertake downstream flood control tasks, the objectives of reservoir scheduling include: flood control safety at dow...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com