Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Gob-side entry driving small coal pillar anti-impact pressure-releasing and counter-pulled anchoring integrated structure and construction method thereof

A technology of small coal pillars and anti-scouring, which is applied in the direction of earthwork drilling, bolt installation, and mining equipment. The number of holes and the effect of consolidating safe production conditions

Pending Publication Date: 2018-09-28
中煤能源研究院有限责任公司
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In practical application, the width of the coal pillars between the tunneling roadway and the roadway of the previous working face ranges from 3 to 8m, and the reserved coal pillars are in the stress reduction area, but in some places with large buried depth, strong mine pressure, and In a mine with a risk of impact, when excavating gob-side roading, the coal pillar is seriously deformed under pressure, and the displacement of the side of the road is large, and there is still a certain risk of mine pressure impact, which threatens the safe production of the mine.
When anchor cables are used to reinforce small coal pillars in the conventional way, resin anchoring agent is used in the anchor section of the anchor cables. After the small coal pillars are crushed, the anchoring force of the anchor cables is greatly reduced, because the reinforcement effect is poor and the roadway deformation is large

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Gob-side entry driving small coal pillar anti-impact pressure-releasing and counter-pulled anchoring integrated structure and construction method thereof
  • Gob-side entry driving small coal pillar anti-impact pressure-releasing and counter-pulled anchoring integrated structure and construction method thereof
  • Gob-side entry driving small coal pillar anti-impact pressure-releasing and counter-pulled anchoring integrated structure and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0027] Coal mine A adopts anti-scouring, pressure relief, anti-scouring, pressure relief, anti-scourt, tension and anchoring integrated structure and construction method when setting small coal pillars along the gob-side roadway. Coal mine A is mining 3 coals. The average thickness of 3 coals is 5m, near the horizontal coal seam, and the buried depth is about 500m. Two troughs are arranged on the working face, which are the transport trough and the return air trough. The return air chute of the 30104 working face adopts gob-side digging, and a small coal pillar is left between the return air chute of the 30104 working face and the transportation chute of the 30102 working face, and the width of the small coal pillar is 6m. 3. The coal is identified as a coal seam with a weak impact tendency, and the integrated structure of anti-scouring, pressure relief, tension and anchorage is applied to this working face when implementing gob-side entry.

[0028] The construction method of ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a gob-side entry driving small coal pillar anti-impact pressure-releasing and counter-pulled anchoring integrated structure and a construction method thereof. An upper row of counter-pulled anchor cables and a lower row of counter-pulled anchor cables are adopted at gob-side entry driving small coal pillars for reinforced supporting, drill holes of the upper row of counter-pulled anchor cables adopt anti-impact pressure-releasing large-diameter drill holes, the two ends of each large-diameter drill hole are filled with concrete to be closed, and the middle of each large-diameter drill hole is hollow. The large-diameter drill holes are constructed in the coal pillars, and the counter-pulled anchor cables are mounted on the coal pillars, the functions of anti-impact pressure releasing and anchor cable mounting are integrated, the dual effects of coal pillar anti-impact pressure releasing and coal pillar bidirectional reinforcing through the counter-pulled anchor cables are achieved, the stability of the coal pillars is improved, deformation of entry sides is reduced, the counter-pulled anchor cables can be prevented from being broken under pulling and then flying off through the mode that the two ends of each drill hole are closed through the concrete, and poisonous and harmful gas and gob accumulated water are prevented from entering a gob-side entry driving roadway. The gob-side entry driving small coal pillar anti-impact pressure-releasing and counter-pulled anchoring integrated structure and the construction method thereof are suitable for anti-impact pressure releasing and reinforcing of the coal pillars of coal mines.

Description

technical field [0001] The invention belongs to the technical field of gob-side digging in coal mines, and in particular relates to an anti-scouring, pressure-relief, pull-and-anchor integrated structure and a construction method for small coal pillars in gob-side digging. Background technique [0002] Coal pillar-free mining can rationally develop coal resources, improve coal recovery rate, and reduce roadway excavation. Pillarless mining mainly includes two methods: gob-side entry without pillar mining and gob-side entry retaining without pillar mining. Gob-side driving is to excavate the roadway along the edge of the goaf after the impact of mining caused by the mining of the previous working face is stabilized. In practical application, the width of the coal pillars between the tunneling roadway and the roadway of the previous working face ranges from 3 to 8m, and the reserved coal pillars are in the stress reduction area, but in some places with large buried depth, str...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D21/00E21D20/00
CPCE21D20/003E21D21/008
Inventor 祁和刚郑忠友吴玉意朱磊李学强蔡峰刘立新刘毅涛
Owner 中煤能源研究院有限责任公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional