Plain river benthic animal habitat construction method
A technology of benthic animals and construction methods, applied in construction, water conservancy engineering, marine engineering and other directions, can solve problems such as the decline of benthic habitat quality and biodiversity, and achieve the effect of increasing community diversity and improving habitat quality.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0107] Step 1. The section of the plain river near the first riparian zone where the flow velocity is less than 0.4m / s is preliminarily selected as the benthic habitat construction section, and the length of the benthic habitat construction section is 230m;
[0108] Step 2. At the upstream of the river section where the benthic habitat is constructed, a plurality of porous rockfill weirs are constructed along the extension direction of the first riparian zone, wherein any one of the porous rockfill weirs is from the first bank The length of the belt extending to Hanoi is 2.0m, and the distance between two adjacent porous rockfill dams is 10m; a total of 8 porous rockfill dams are set up; close between two porous rockfill dams The waters of the first riparian zone are transplanted with multiple patches of cattails and / or calamus to form an aquatic plant community, wherein the extension of the aquatic plant community on part of the first riparian zone is at least 40m, and the transp...
Embodiment 2
[0119] Step 1: Preliminarily select the plain river section near the first riparian zone where the flow velocity is less than 0.4m / s as the benthic habitat construction section, and the benthic habitat construction section has a length of 200m;
[0120] Step 2. At the upstream of the river section where the benthic habitat is constructed, a plurality of porous rockfill weirs are constructed along the extension direction of the first riparian zone, wherein any one of the porous rockfill weirs is from the first bank The length of the belt extending to Hanoi is 2.5m, and the distance between two adjacent porous rockfill dams is 12m; a total of 6 porous rockfill dams are set;
[0121] The water area near the first riparian zone between the two or two porous rockfill dams is transplanted in multiple patches of cattails and / or calamus to form an aquatic plant community, wherein the aquatic plant community is part of the first The extension length of a riparian zone is 40m, and each patch...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com