Building supply chain management method and device thereof based on 4D BIM and GIS
A supply chain management and supply chain technology, applied in data processing applications, instruments, forecasting, etc., can solve the problems of discontinuous construction supply chain, difficult and effective construction supply chain management, etc., and achieve a more scientific and effective construction supply chain management. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] The embodiment of the present invention provides a construction supply chain management method based on 4D BIM and GIS, which is suitable for the execution of a system composed of 4DBIM and GIS, see figure 1 , the method can include:
[0042] Step S11, from the preset 4D BIM system, obtain the information of the construction project to be tested at the construction site (for example: a real estate) and the information of the supplier providing building materials for the construction project to be tested. The construction project information to be tested includes: construction to be tested The demand information of building materials (referred to as building materials) of the project, the on-site inventory information of building materials, and the information of the start time plan, and the supplier information includes: the types and prices of building materials supplied.
[0043]In this embodiment, in the preset 4D BIM system, information on the construction project t...
Embodiment 2
[0088] An embodiment of the present invention provides a construction supply chain management device based on 4D BIM and GIS, which adopts the construction supply chain management method described in Embodiment 1, see image 3 , the device may include: an acquisition module 100 , a construction module 200 , and a processing module 300 .
[0089]The obtaining module 100 is used to obtain the information of the construction project to be tested at the construction site (for example: a real estate) and the supplier of building materials for the construction project to be tested from the preset 4D BIM system. The construction project information to be tested includes: The demand information of building materials (referred to as building materials) of the construction project to be tested, the on-site inventory information of building materials, and the start time plan information, and the supplier information include: the types and prices of building materials supplied.
[0090] I...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com