Geographic information system short-term load prediction method based on mesh method
A geographic information system, short-term load forecasting technology, applied in forecasting, data processing applications, instruments, etc., can solve the problems of grid division, less research on merging, and no consideration of simplification of the load forecasting process, and achieve the effect of improving accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0091] This embodiment selects some areas of a region, and uses the grid load division, merging model and intelligent algorithm of this application to carry out short-term load forecasting according to the data provided by the geographic information system.
[0092] The first step, the division of grid load
[0093] First, based on the data provided by geographic information, a certain area is initially divided into 9 square grid loads according to the street layout. Secondly, grid loads are classified according to different load uses to form grid loads with different names. Finally, Grid Loading takes into account the effect of load density. Areas with high load density and concentrated load shall be further divided; areas with low load density shall be divided together with adjacent loads of the same type. Finally, the result of grid division is obtained as image 3 shown.
[0094] The second step, the merging of grid loads
[0095] Carry out load forecasting for the merg...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com